Calculate the total duration for the four activity project, Civil Engineering

Assignment Help:

Calculate the Total Duration for the Four Activity Project

1260_Calculate the Total Duration for the Four Activity Project 1.png

Solution:     

Scheduling work activity has associated time duration. The durations shown in the Table were estimated for the project diagrammed below. The entire set of activities would then require 3-days, since the activities follow one another directly and require a total of 1.0 + 0.5 + 0.5 + 1.0 = 3-days (answer is c). If another activity proceeded in parallel with this sequence, the 3 day minimum duration of these four activities is unaffected. More than 3 days would be required for the sequence if there was a delay or a lag between the completion of one activity and the start of another.

1026_Calculate the Total Duration for the Four Activity Project 2.png


Related Discussions:- Calculate the total duration for the four activity project

Mohrs circle, The state of stress at a point is given through the stress co...

The state of stress at a point is given through the stress components sx = 70 MPa, sy = 10 MPa, and txy = - 40 MPa. Using Mohr''s circle find (i) Principal stresses, and (ii) Princ

Concrete pavement - thickness, Concrete Pavement: Thickness T...

Concrete Pavement: Thickness The thickness of concrete pavements is determined from the stresses induced due to loads and temperature. The thickness adopted is genera

Define vertical curves - transportation, Define Vertical Curves  - Transpor...

Define Vertical Curves  - Transportation 1) Vertical curves are used to change the grade of a highway. 2) Most vertical curves take the shape of an equal-tangent parabola.

Rcc, difference between RCC and RBC

difference between RCC and RBC

Determine the total active thrust by rebhann''s method, A retaining wall 3....

A retaining wall 3.6 m high supports a dry cohesion less backfill with a plane ground surface sloping upwards at a surcharge angle of 20° from the top of the wall. The back of the

Cross drainage work, Cross Drainage Work: Several natural streams, ri...

Cross Drainage Work: Several natural streams, rivers and canals cross the road. They have to be led across the road through culverts and bridges. That given structures is kno

Scour, Q. What do you mean by Scour? Whenever a bridge crosses a waterw...

Q. What do you mean by Scour? Whenever a bridge crosses a waterway, even a small or intermittent one, scour is a dangerous effect that can damage bridge piers and undermine fou

Define the limitations of shock transmission unit, Define the Limitations o...

Define the Limitations of shock transmission unit? STUs are not intended for energy/shock absorption. They simply transmit load from one part of the structure to another thus s

What is diamond crossing, Q. What is Diamond Crossing? Diamond Crossing...

Q. What is Diamond Crossing? Diamond Crossing is provided when two tracks cross each other either of the same gauge or of different gauges. It consists of two acute crossing (

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd