Explain the Equation for a Suppressed Rectangular Weir

If the approach velocity is negligible, velocity head can be excluded and the equation becomes the Francis weir equation:

      Q = 2/3 C1b√2g H1.5= Q = 3.33L H1.5

C1 = Rehbock coefficient to account for all assumptions, usually given as 0.61 or 0.62. The equation to calculate the Rehbock coefficient is in references.


Related Discussions:- Explain the equation for a suppressed rectangular weir

Disparity between working stress and limit state approach, Question Wha...

Question What is key disparity between working stress approach and limit state approach ? Answer Working stress approach, service loads are used in whole plan and st

Construction of embankment, Construction of Embankment: The following...

Construction of Embankment: The following steps describe embankment construction : (a) The ground is cleared and grubbed and all vegetation, grass, roots, etc. are removed

In marine pile type of steel tubular piles, Question In marine pile typ...

Question In marine pile type of steel tubular piles with reinforced concrete infill, least toe level is frequently specified in contract drawings. What is the purpose in your v

Inspection of girder bridge, Q. As an AEN in charge, what inspection will...

Q. As an AEN in charge, what inspection will you under taken at the time of inspection of Girder Bridge 3 x 60 feet. Please explain the important items to be o

Show ph value of water, Q. PH Value of Water? It is a symbol for hydrog...

Q. PH Value of Water? It is a symbol for hydrogen ion concentration and indicates acidity or alkalinity. When P H Value more than 7 water is alkaline and less than 7 water is a

Construction equipments, what is preventive maintenance and state its advan...

what is preventive maintenance and state its advantages

Illustrate weld failures in track, Q. Illustrate Weld Failures in Track? ...

Q. Illustrate Weld Failures in Track? These are failures occurring to defects in welding the joint. These defects are either because of improper composition of thermit metal or

Dam, how can i prepare a project on dam

how can i prepare a project on dam

Verify the void ratio and water content, Derive the relation among void rat...

Derive the relation among void ratio (e), specific gravity of particles (G) and moisture content at full saturation (w). A certain sample of saturated soil in a container weighs

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd