What is load transfer mechanism for paving blocks in pedestrian footway?

Answer

In Hong Kong, footway is as a rule designed with paving slabs or interlocking blocks in its place of concrete since extensive use of concrete in pavement is boring. In addition poor appearance will result in concrete pavement due to recurrently trench openings for utility work. In adding up, owing to prolonged setting and curing time of concrete, use of concrete pavement inevitably generates trouble to the general public.

Pedestrian loads are taken up from side to side following ways-

(i) Load transport capacity of paving slabs/ interlocking blocks are derived from their individual power

(ii) Pedestrian loads are as well supported by interlocking forces provided by friction transfer through sand in vertical joints

 


Related Discussions:- load transfer mechanism

Gg, ggggggggggg

ggggggggggg

Levelling, Permanent adjustment and temporary adjustment

Permanent adjustment and temporary adjustment

Distance between concrete columns in 5 story building, distance between con...

distance between concrete columns in 5 story building and if there is distance 15 feet than what should be the column size and how many bars and diameter of each bar ?

Linear programming, what are the advantages of linear programming?

what are the advantages of linear programming?

Determine the total head and total pressure of water, Determine the total h...

Determine the total head and total pressure of water flowing at  in a pipe which has the following data: Flow= 2,500 gpm; Elevation = 30 ft; Pressure = 40 psi; Pipe Diameter =

Test for determination of uitimate compressive strength, Q. Test for determ...

Q. Test for determination of Ultimate Compressive Strength The test pieces are to be loaded either till the failure of the steel laiminate or till the irreversible squeezing ou

Define safety precaution for underwater inspection of bridge, Define Safety...

Define Safety Precautions for Underwater Inspection of Bridge? The working agency should have its own diving safety manual, which should be strictly followed. This manual shoul

Precast concrete jacking pipes, Question While precast concrete jackin...

Question While precast concrete jacking pipes , from time to time grout holes are calculated inside these precast pipes. Give specific and key reasons? Answer Grout h

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd