Q. What is Activated Sludge process?

The term Activated Sludge is used to indicate the sludge which is obtained by settling sewage in presence of abundant oxygen. The Activated Sludge is biologically active and it contains a large number of aerobic bacteria and other micro organisms which have got an unusual property to oxidise organic matter.

Activated Sludge is mixed with raw or partially treated sewage. When Activated Sludge is mixed properly with sewage containing ample or sufficient quantity of oxygen, micro organisms present in Activated Sludge multiply rapidly as result of this.

a) Organic solids present in sewage are rapidly oxidised.

b) Suspended and colloidal matters coagulate and they from a readily settleable precipitate.

After such precipitate settles down the effluent which is obtained is clear and sparking. The effluent contains very low amount of organic matter. A portion of settled sludge is sent for recirculation and the remaining part is sent to sludge digestion tanks. The digested sludge is harmless.


Related Discussions:- What is activated sludge process

What is dead weight, Dead weight Dead loads are the weight of perma...

Dead weight Dead loads are the weight of permanent components of the structures such as the weight of the elements and spheres, casing weight, weight of the false ceiling a

Determine the time of settlement of a sand particle, Using Stokes' law, det...

Using Stokes' law, determine the time of settlement of a sand particle of 0.2 mm size (specific gravity 2.67) through a depth of water of 30 cm. The viscosity of water is 0.001 N-s

Steel structures, how does battening differ from lacing?

how does battening differ from lacing?

Rcc flooting, Explain the simple square footing, simple squral footing an...

Explain the simple square footing, simple squral footing and slop footing with the help of drawing

Base of concrete retaining walls, Q. Granular fill or rock fill essential a...

Q. Granular fill or rock fill essential at the base of concrete retaining walls? It isn't uncommon that rock fill layers and granular fill layers are placed beneath the bottom

Determine the total lateral pressure on the wall, A masonry retaining wall ...

A masonry retaining wall is 1.5 m wide at the top, 3.5 m wide at the base and 6 m high. It is trapezoidal in section and has a vertical face on the earth side. The backfill is leve

Dry process of cement, i want a complete flow chart of dry process of cemen...

i want a complete flow chart of dry process of cement

Find the maximum stress, Find the maximum stress: A circular bar rigid...

Find the maximum stress: A circular bar rigidly fixed at both ends is 1 m long and tapers uniformly from 20 cm diameter at one end to 10 cm diameter at the other end. Find the

Road pavements, Road Pavements: Pavements constitute an important part...

Road Pavements: Pavements constitute an important part of road as they withstand the traffic loads and transmit them to the earthen embankment. A study of the types of pavemen

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd