What is activated sludge process, Civil Engineering

Assignment Help:

Q. What is Activated Sludge process?

The term Activated Sludge is used to indicate the sludge which is obtained by settling sewage in presence of abundant oxygen. The Activated Sludge is biologically active and it contains a large number of aerobic bacteria and other micro organisms which have got an unusual property to oxidise organic matter.

Activated Sludge is mixed with raw or partially treated sewage. When Activated Sludge is mixed properly with sewage containing ample or sufficient quantity of oxygen, micro organisms present in Activated Sludge multiply rapidly as result of this.

a) Organic solids present in sewage are rapidly oxidised.

b) Suspended and colloidal matters coagulate and they from a readily settleable precipitate.

After such precipitate settles down the effluent which is obtained is clear and sparking. The effluent contains very low amount of organic matter. A portion of settled sludge is sent for recirculation and the remaining part is sent to sludge digestion tanks. The digested sludge is harmless.


Related Discussions:- What is activated sludge process

Courswork, looking for someone good at structure analysis and design cours...

looking for someone good at structure analysis and design courswork

CBR of soil, Why IRC 37-2012 has taken 90th percentile for pavement design ...

Why IRC 37-2012 has taken 90th percentile for pavement design of expressway or NH while they hav taken 80th percentile for state highway design ????????

Rmc, about rmc and what are the safety measures taken and which licences ar...

about rmc and what are the safety measures taken and which licences are required

Increasing concrete cover beyond contractual, Question If contractor sugges...

Question If contractor suggests increasing concrete cover beyond contractual such as 40mm to 70mm shall engineers accept suggestion? Answer In contractual part, based on requir

Surveying, obstacles in chain surveying

obstacles in chain surveying

Standard mixes of concrete, In some nations such as Britain, specification ...

In some nations such as Britain, specification for concrete doesn'tusually require cube tests for standard mixes of concrete. Quality control of standard mixes in Britain is achiev

Diver qualification - diving operation for bridge inspection, Define Diver ...

Define Diver Qualification - Diving Operation for Bridge Inspection? The requisite qualification for divers and diving supervisors are given in IS 10291 -1982, which stipulates

Calculate the total cost for the project, The total equipment cost for an a...

The total equipment cost for an addition to a pharmaceutical plant is estimated to be $5,000,000. The percentages provided in the Table represent the average expenditures in other

Road maintenance, Road Maintenance: Importance of Road Maintenance ...

Road Maintenance: Importance of Road Maintenance Roads deteriorate in their condition due to traffic, rain, snowfall and temperature variations. They requirement to b

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd