Q. What do you mean by Elastomeric bearings?
Steel bearings are good but suffer from problems of corrosion and high level of maintenance. Due to these problems of steel bearings, engineers were on the lookout for a bearing which could accomodate large movements and at the same time being relatively maintenance free. Elastomer as a material for making bridge bearing has been found to satisfy these requirements so much so that many engineers believe that the search for an ideal material for bridge bearing has come to an end. Further developments in future may involve refining the use of elastomer and enhancing its properties.
To summarise, the elastomeric bearings offer number of advantage as listed below:
1. Requires minimum maintenance compared to all other bearings.
2. Installation is easy.
3. Permits movement of the structure in all directions, depending upon the applied forces.
4. Occupies small space.
5. Serves as a shock absorber due to anti-vibra- tion properties of elastomer.
6. Acts as an aid to better dispersion of longitudinal forces to the approaches.
Q. What is Rapid Sand Filter? A Rapid Sand Filter is a water treatment plant that includes provision for pre treating the water by coagulation and sedimentation for settlement
Q. What is Activated Sludge process? The term Activated Sludge is used to indicate the sludge which is obtained by settling sewage in presence of abundant oxygen. The Activated
built in truss
A bed of sand 12 m thick is underlain by a compressible stratum of normally loaded clay, 6 m thick. The water table is at a depth of 5 m below the ground level. The bulk densities
A square pile group of 16 piles passes by a filled up soil of 3 m depth. The pile diameter is 25 cm and pile spacing is 75 cm. If the unit cohesion of the material is 18 kN/m 2 an
Ground settlement occurs ahead or behind the jacking face for pipe-jacking? It's reported by Lake (1992) that settlements are expected at ground surface at a distance of 1-2 ti
staircase
#question why cracks develops on the surface of concrete on the next day of casting?
Topographical Survey and Preparation of Drawings: Topographical Survey for a road project consists of three sequential stages: (a) Reconnaissance Survey, including a study
Define Construction damage - underwater inspection of bridge? Construction damage can result from improper procedures during the construction phase. Some examples are: - P
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd