A square pile group of 16 piles passes by a filled up soil of 3 m depth. The pile diameter is 25 cm and pile spacing is 75 cm. If the unit cohesion of the material is 18 kN/m2 and unit weight is 15 kN/m3.
Compute the negative skin friction on the group.
describe setting out right angle at given point on a chain line and when the point lies outside the chain line
Maintenance of Water Bound Macadam Roads: The maintenance of water bound macadam surface consists of : filling potholes, ruts with additional material and adequately c
Describe about the Prestressed concrete Civil engineering structures, such as buildings, bridges, dams, towers etc. and their structural components such as beams, columns, slab
radial line method practical
Non-distortional Prestressing Concrete members deflect due to their own self weight. If prestressing force is applied in such a way that these deflections are eliminated due to
geometic design of streetsand highways
Question For a l ong slender structure similar to beams, propping is compulsory after elimination of formwork with reasons? Answer After concreting, time at which arresting of
how do one uses the Macauleys model to find deflections of bars
how do i Setting up The total station theodolite?
what are the uses of retaining wall?!
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd