Jacking face for pipe-jacking, Civil Engineering

Assignment Help:

Ground settlement occurs ahead or behind the jacking face for pipe-jacking?

It's reported by Lake (1992) that settlements are expected at ground surface at a distance of 1-2 times of tunnel depth ahead of tunnel face and 80% to 90% of settlement to be finished at a similar distance behind the face. Though in the paper 'Monitoring of ground response associated with pipe jacking works - recent experience in Hong Kong', the author highlighted that based on their experience, development of longitudinal settlement was observed at a distance of 3-4 times of tunnel depth behind the tunnel face and little settlements were reported immediately above the tunnelling face.


Related Discussions:- Jacking face for pipe-jacking

Ghgh, Ask quhestion #Minimum 100 words accepted#

Ask quhestion #Minimum 100 words accepted#

Importance of racking load for a pre-stressed concrete beam, Importance of ...

Importance of racking load for a pre-stressed concrete beam Evaluation of cracking load for a pre-stressed concrete beam member is important for the following cases/reasons.

Explain the dynamic or vibration tests, Explain the Dynamic or Vibration Te...

Explain the Dynamic or Vibration Tests Tests of this type, also known as sonic integrity test, involve sub- jecting the element to a single impulsive blow or cyclic load, and

Vectors application, how does vectors apply mathamatical in civil engineeri...

how does vectors apply mathamatical in civil engineering

Amount of borrow needed to bring area to elevation of 90-ft, Surveyed eleva...

Surveyed elevations are shown in Figure for a 50' x 50' grid at a proposed parking lot location. The amount of borrow needed to bring the area to an elevation of 90-ft is most near

Dams, The regulations and specifications that followed for compaction works...

The regulations and specifications that followed for compaction works for earth dam in Oman

Piers and piles, what is the difference between piers and piles?

what is the difference between piers and piles?

Trusses design, does the truss pitch relate to the building''s height?

does the truss pitch relate to the building''s height?

Building, individual wall methods benefits?

individual wall methods benefits?

Find a suitable slab thickness, The continuous one-way slab shown below is ...

The continuous one-way slab shown below is loaded with a uniform service live load of 80 psf, and a superimposed dead load of 40 psf. Assume the beam width is 16" and use f'c = 5 k

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd