Ground settlement occurs ahead or behind the jacking face for pipe-jacking?

It's reported by Lake (1992) that settlements are expected at ground surface at a distance of 1-2 times of tunnel depth ahead of tunnel face and 80% to 90% of settlement to be finished at a similar distance behind the face. Though in the paper 'Monitoring of ground response associated with pipe jacking works - recent experience in Hong Kong', the author highlighted that based on their experience, development of longitudinal settlement was observed at a distance of 3-4 times of tunnel depth behind the tunnel face and little settlements were reported immediately above the tunnelling face.


Related Discussions:- Jacking face for pipe-jacking

Test on specially moulded test piece, Test on specially moulded test piece ...

Test on specially moulded test piece The test piece shall be moulded by the manufacturer with identical compound and under identical vulcanizing conditions as used in manufact

What is material at site return, Q. What is Material at site Return? Th...

Q. What is Material at site Return? The authority is executive charge of a work should be responsible for holding in safe custody for controlling the consumption and to the ext

Arrangement of piles in a pile cap to reduce bending moment, Arrangement of...

Arrangement of piles in a pile cap to reduce bending moment induced in piles Let's consider that piles are designed to intersect at a single common point in a pile cap. The re

Torsion, what is torsional moment of resistance

what is torsional moment of resistance

Continuous beam reaction by equilibrium equation, Solve problem of continu...

Solve problem of continuous beam with equilibrium equation

Concrete , advantage and disadvantage of concrete

advantage and disadvantage of concrete

Investigation scour for underwater inspection of bridge, Define Investigati...

Define Investigation Scour for Underwater Inspection of Bridge? Investigation Scour is probably the most critical item to be aware of when performing an underwater inspection o

Water or hydraulic horsepower (whp), Water Or Hydraulic Horsepower (whp) ...

Water Or Hydraulic Horsepower (whp) The work performed by a pump is a function of the head added by the pump (h A ), the flow rate required (Q) and the mass of the fluid (accou

Meaning, i want the meaning of crete

i want the meaning of crete

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd