By which materials shank of a spur construct, Civil Engineering

Assignment Help:

Q. By which Materials Shank of a spur construct?

Shank of a spur is constructed of sand core and its exposed faces are protected by stone pitching. The attack at nose is very heavy and hence the nose may be constructed wholly in stone. Alternatively if attack is heavy all over the spur length or if it is easier and not very expensive to construct the spur wholly in stone, such a construction may be preferred. The apron should be in stone of the same size as used for slope protection of guide bunds.

Permeable spurs are constructed by driving wooden bally piles to achieve penetration below riverbed of 6.0 to 9.2m. The ballies are normally 22.5 to 37.5 cm in diameter. Mattress or stone carpet is provided on river bed to prevent scour.


Related Discussions:- By which materials shank of a spur construct

Mechanics, laws of solid friction?

laws of solid friction?

Centroid, how tofind centroid of cercular arc

how tofind centroid of cercular arc

Strength of materials, #questionwhat is the shear force and bending moment....

#questionwhat is the shear force and bending moment..

CANTILEVER RETAINING WALL, NEED TO DESIGN A CANTILEVER RETAINING WALL 8M HI...

NEED TO DESIGN A CANTILEVER RETAINING WALL 8M HIGH, SATURATED UNIT WEIGHT IS 16KN/M3, SURCHARGE IS 7KN/M2, LOAD ABOVE WALL SUPPORTED ON WALL STEM IS 10KN/M RUN, ANGLE IN INTERNAL F

Bridge abutment be placed under an embankment, Question It should be necess...

Question It should be necessary that raking piles of a bridge abutment be placed under an embankment ? Answer For a bridge abutment to be supported on raking piles with dive

Bituminous concrete, Bituminous Concrete: Bituminous Concrete (BC) is...

Bituminous Concrete: Bituminous Concrete (BC) is a hot-mix superior type of bituminous surfacing, having a low voids (3-5 per cent), good durability high imperviousness and g

Calculate the cost to finance the construction project, A contractor is bid...

A contractor is bidding a construction project that will take 12 months to complete. The terms of the bid provide that the owner will pay the Contractor one lump sum at the end of

Explain the classification of solid waste, Explain the Classification of So...

Explain the Classification of Solid Waste  Solid waste can be classified in several different ways.  Putrescible waste - Animal and Vegetable waste From Cooking and

How to do deflection calculations, How to do deflection calculations Ba...

How to do deflection calculations Basic values of span to effective depth ratios for spans upto 10m may be taken as 7, 20 and 26 for cantilever, simply supported and continuous

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd