Q. Illustrate the Design discharge for foundation?
To provide for an adequate margin of safety, the foundation and protective works of a bridge should be designed for a flood discharge of higher magnitude than the waterway design discharge. For this purpose, the waterway design discharge may be increased by the percentages given in Table.
Table: Foundation Design Discharge with Percentage Addition to Waterway Design Discharge
definition of cross draunage works
Question For fixing of silt curtains, what is the reason that it does not desirable to design the curtain to touch the seabed ? Answer Silt finished are resistant ve
Q- What are loads and forces taken into account for designing a pile and what is load carrying capacity of a pile. Ans. For designing a pile the following loads and force ar
The liquid limit of a clay soil is 56% and its plasticity index is 15%. (a) Name the state of consistency is this material at a water content of 45% ? (b) Determine the plas
Cd of venturimeter is more than that of orificemeter
State the effect of shape on the bearing capacity. Differentiate among safe bearing capacity and allowable soil pressure. Write critical notes on (i) foundations on black cot
What is the difference between shear and tensile strength? Ans) Tensile Strength for a Bolt is explained by applying a Force along it long axis. Shear Strength for a Bolt is exp
In a pipette analysis, 0.5 N of dry soil (fine fraction) of specific gravity 2.72 were mixed in water to form half a litre of uniform suspension. A pipette of 10 ml capacity was
Explain the Tertiary Treatment for Wastewater Tertiary Treatment: in cases where secondary treatment is not adequate (particularly if the discharges are into a sensitive water
Question After construction of watermain, earlier to hydrostatic pressure test , swabbing is approved out. What is main purpose of swabbing ? Answer Pipelines ha
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd