Q. Illustrate the Design discharge for foundation?

To provide for an adequate margin of safety, the foundation and protective works of a bridge should be designed for a flood discharge of higher magnitude than the waterway design discharge. For this purpose, the waterway design discharge may be increased by the percentages given in Table.

Table:  Foundation Design Discharge with Percentage Addition to Waterway Design Discharge

1244_Design discharge for foundation.png


Related Discussions:- Illustrate the design discharge for foundation

Define in brief about the term - concrete, Define in brief about the term -...

Define in brief about the term - Concrete Concrete is reinforced with steel bars in structural components so that the tensile stresses are taken up by the reinforcement. These

Define ways of providing the anti slip device - by embedment, Define Ways o...

Define Ways of providing the anti slip device - By Embedment? A recess can be created in the bed block in which the elastomeric pad will be placed. The functioning of the reces

Benefits of analysis of prestress and bending stresses, Normal 0 ...

Normal 0 false false false EN-IN X-NONE X-NONE

Brigdes, infomation about differnt brigdes

infomation about differnt brigdes

W.M.M., What is W.M.M. roads? Where its used ?

What is W.M.M. roads? Where its used ?

Effect of pile installation method, Effect of pile installation method to l...

Effect of pile installation method to load carrying capacity of piles The construction of piles by driving method causes an increase in density of surrounding soils. Therefore

Show method of greasing, Method of Greasing : Greasing of fixed end require...

Method of Greasing : Greasing of fixed end requires 20 to 25 minutes. The lifting is hardly 10 mm, ensuring that the gap is created between saddle block and knuckle pin. Saddle is

Large catchments in estimating peak runoff, Question Is it true that ra...

Question Is it true that rational process has to not be used for large catchments in estimating peak runoff ? Answer Rational process is appropriate for small catchme

Tension member, Explain various forms of tension members.

Explain various forms of tension members.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd