Q. Illustrate the Design discharge for foundation?

To provide for an adequate margin of safety, the foundation and protective works of a bridge should be designed for a flood discharge of higher magnitude than the waterway design discharge. For this purpose, the waterway design discharge may be increased by the percentages given in Table.

Table:  Foundation Design Discharge with Percentage Addition to Waterway Design Discharge

1244_Design discharge for foundation.png


Related Discussions:- Illustrate the design discharge for foundation

Doors, types of doors with there prices

types of doors with there prices

Principle of airlifting for cleaning pile bores, Q. Principle of airlifting...

Q. Principle of airlifting for cleaning pile bores? Airlifting is generally carried out before concreting to remove debris and clean the base of pile bores. It basically acts a

Underwater problems in bridge construction, Q. Underwater problems in bridg...

Q. Underwater problems in bridge construction? The major bridge construction materials are steel and concrete. In the past, stone and brick masonry, with lime mortar as binding

Return period for design situations, Question While design life will it...

Question While design life will it be same as return period for design situations ? Answer Design life means least duration a structure is accepted to last. Longe

Reason of skin reinforcement for deep beams, Question What is reason of sk...

Question What is reason of skin reinforcement for deep beams ? Answer In BS8110, it declares that secondary reinforcement have to be provided for beams greater than 750mm deep

Wmm, wmm how can test depth wise

wmm how can test depth wise

Solid block -calculating for design mix, Good evening sir, solid block''s d...

Good evening sir, solid block''s design mix calculated generally please explain and derive .

Measure the safe load on the pile, A wood pile of 10 m length is driven by ...

A wood pile of 10 m length is driven by a 1500 kg drop hammer falling by 3 m to a final set equal to 1.25 cm per blow. Measure the safe load on the pile using the Engineering Ne

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd