Q. Explain Foundation design discharge for a bridge?
To provide for an adequate margin of safety against any abnormal flood exceeding the design discharge (Q), the foundations, protection works and training works shall be designed for a higher flood discharge. This discharge shall be computed by increasing the design discharge (Q) estimated for waterway shall be based on (a) actual hydro-meteorological observations of the same or similar catchments (b) the computed flood with probable recurrence intervals of 50 years. The recurrence interval can be modified at the discretion of Chief Bridge Engineer based on the importance of the line.
i)
Catchment upto 500 sq.km.
30%
ii)
Catchment more than 500 sq. km. and upto 5000 sq. km.
30% to 20% (decreasing with increase in area)
iii)
Catchment more than 5000 sq.km. and upto 25,000 sq.km.
20% to 10% (decreasing with increase in area)
iv)
Catchment more than 25,000 sq.km.
Less than 10%(at the discretion of the Chief Bridge Engineer).
A 160-HP Diesel engine (peak fuel consumption = 0.04-gal/HP-hr) hydraulic excavator operates on a cycle time of 20 seconds during a 50-min/hr. During the filling of the bucket cyc
Question In case of for unreinforced concrete carriageway, what will succession of closing and opening of expansion joints and contraction joints? Answer Take a case t
A concrete batch plant provided the Design Strength for the engineer's mix design to match the project's specification requirement for a 4000 psi Tremie pump mix. The Water-cement
Methods of orientation,Principles of resection
degrees of freedom
Draw the shape of the Pressure line. Solution The locations of resultant force at sections A-A, B-B and C-C have already been determined. Joining these locations, we can dr
i dont know how to calculate moment of inerta
elements of vibratory system
Define Contaminants - underwater inspection of bridge? There are various substances that may be inadvertently incorporated into the concrete matrix (e.g. glass, coal, gypsum),
Are you capable to do me 6 pages steel report in 48 H ?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd