What is sedimentation tank, Civil Engineering

Assignment Help:

Q. What is Sedimentation tank ?

This is a process in which the water is passed through bases or tanks in which the velocity of water is so reduced or water is given a period of rest that permits the heavy Suspended particles settle at the bottom by action of gravity and force in the Sedimentation tank . This is necessary because water contains suspended matter which might choke the filters.

There are two types of Sedimentation.

1. Plain Sedimentation

2. Sedimentation with coagulants or Chemical Sedimentation.

Detention Period - 6-to8 hrs for Plain Sedimentation & 1.5 To 3 hrs for Chemical Sedimentation.

Depth of flow - 3 to 6 meters.

Velocity of flow - 30 cm / min.

Length of tank = 3 to 4 time of width of tank.

Bottom slope - 1: 100

In case of circular tank dia less than 60m.

Type of Sedimentation Tank -

1. Horizontal flow Sedimentation Tank

2. Up ward flow Sedimentation Tank

3. Circular Sedimentation Tank


Related Discussions:- What is sedimentation tank

Method of observation by satellite, Q. Method of observation by satellite? ...

Q. Method of observation by satellite? The difference between a photographs and imageries needs to be understood first. A photograph covers a specific area within its view and

Mechanics problem, i am facing some problem in solving the problem of elong...

i am facing some problem in solving the problem of elongation due to self weight suspended from fixed support in the conical bar

Road binders - bitumen, Road Binders: Bitumen: Bitumen is a viscous, s...

Road Binders: Bitumen: Bitumen is a viscous, semi-solid material, dark in color, having adhesive properties, and derived from the distillation of petroleum crude in a refinery

Surveying, WCB from included angle

WCB from included angle

Determine the uniformly distributed load, A rectangular area 4 m × 6 m carr...

A rectangular area 4 m × 6 m carries a uniformly distributed load of 100 kN/m 2 at the ground surface. Estimate the vertical pressure at a depth of 6 m vertically below the centre

How double drainage occur, The loading period for a building extended from ...

The loading period for a building extended from Feb., 1957 to Feb., 1959. In Feb., 1962, the average measured settlement was found to be 117 mm. The ultimate settlement was expecte

Surveying, Use of optical square in chain surveying?

Use of optical square in chain surveying?

Find the youngs modulus of the rod, Find the Youngs modulus of the rod: ...

Find the Youngs modulus of the rod: A composite rod is made by joining a copper rod end to end with a second rod of different material but of same cross-section. At 25oC, the

What do you mean by stock verification sheets, Q. What do you mean by Stock...

Q. What do you mean by Stock Verification Sheets? The proper custody and accountal of stores is the prime duty and function of an executive or the stockholder. To ensure this v

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd