What is sedimentation tank, Civil Engineering

Assignment Help:

Q. What is Sedimentation tank ?

This is a process in which the water is passed through bases or tanks in which the velocity of water is so reduced or water is given a period of rest that permits the heavy Suspended particles settle at the bottom by action of gravity and force in the Sedimentation tank . This is necessary because water contains suspended matter which might choke the filters.

There are two types of Sedimentation.

1. Plain Sedimentation

2. Sedimentation with coagulants or Chemical Sedimentation.

Detention Period - 6-to8 hrs for Plain Sedimentation & 1.5 To 3 hrs for Chemical Sedimentation.

Depth of flow - 3 to 6 meters.

Velocity of flow - 30 cm / min.

Length of tank = 3 to 4 time of width of tank.

Bottom slope - 1: 100

In case of circular tank dia less than 60m.

Type of Sedimentation Tank -

1. Horizontal flow Sedimentation Tank

2. Up ward flow Sedimentation Tank

3. Circular Sedimentation Tank


Related Discussions:- What is sedimentation tank

Building, individual wall methods benefits?

individual wall methods benefits?

Draw sketch for track in a cutting on a mainline route, Q. Draw a neat dim...

Q. Draw a neat dimensioned cross-sectional sketches of a - i. New single Line B.G. track in a cutting on a mainline route. ii. New double Line B. G. track on a trunk route ha

Specification of wood work for door, Q. Specification of Wood work for Door...

Q. Specification of Wood work for Door? 1. General - Timber for door, window and ventilators frames shall be as specified. Timber shall be sawn in the direction of the grains.

Calcculate the material costs, A capital improvement project requires the i...

A capital improvement project requires the installation of a property line fence along the 250-ft Northern boundary line.The decorative aluminum fence is constructed of posts space

Show the concrete pressure on formwork, Q. Relation of pouring rate and tem...

Q. Relation of pouring rate and temperature with concrete pressure on formwork Freshly placed concrete exerts pressure on formwork at the time of the placing operation. It's i

Static, Determine the moment of inertia with respect to the x axis for the ...

Determine the moment of inertia with respect to the x axis for the shaded area shown (Figure 2) . The dimension is a = 2.00m .

Millennium mills redevelopment project assignment, Millennium mills redevel...

Millennium mills redevelopment project assignment in group Presentation

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd