What do you mean by base fixity, Civil Engineering

Assignment Help:

Q. What do you mean by Base fixity?

Base fixity

When structures such as portal frames are associated to the base foundation, engineers have to determine the degree of fixity for the connection. Generally the two common design options are fixed bases and pinned bases. Pinned bases have the benefit that design of foundation is made simple so that some cost savings can result. Though fixed bases design provides extra rigidity and stiffening to the structures and stability of structures can be improved. So the use of fixed bases assists to enhance the structural performance of structures.


Related Discussions:- What do you mean by base fixity

Assignment, do u do drawing assignment ( 3rd angle projection)

do u do drawing assignment ( 3rd angle projection)

Show elastomeric bearings, 1. Elastomeric bearings must not be placed one b...

1. Elastomeric bearings must not be placed one behind the other along the longitudinal axis of the girder on a single line of support under any circumstances. 2. Bearings of dif

Granite tiles for construction material, Q. Granite Tiles for construction ...

Q. Granite Tiles for construction material? At every important station for public urinals granite may be used as wall cladding drain and foot rest material. The water sinks at

Binomial distribution - exact probability, Binomial Distribution - exact pr...

Binomial Distribution - exact probability: For the binomial distribution having n = 10, y = 0.4, find p (X ≤ 4) using equations and verify that equation gives a better approxi

Explain template jig, Explain Template Jig? 1) Template jig is the simp...

Explain Template Jig? 1) Template jig is the simplest type of jig, employed for accuracy than speed. 2) This jig fits over, on, or, into the work and is not generally clampe

Pelton wheel, what is the use of the pelton wheel

what is the use of the pelton wheel

Depth of boring for multi-storeyed building, Depth of Boring  for Multi-st...

Depth of Boring  for Multi-storeyed Building Peck has recommended that first drill hole is to be made up to depth at which the presence of a thick layer of soft clay with a hig

Calculate the total duration for the four activity project, Calculate the T...

Calculate the Total Duration for the Four Activity Project Solution:      Scheduling work activity has associated time duration. The durations shown in the Table were e

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd