Assignment Help:

In reclamation involving large volumes of fill and tight programme, shall engineers use marine fill or mud extracted from land borrow area as filling material?

 There are two benefits of adopting marine fill over mud extracted from land borrow area:

(a)  In certain land borrow areas, it includes breaking up of rock to suitable sizes for reclamation and production rate isn't high. With modern equipment for dredging and placing marine fill, the filling rate is much higher.  

(b) Cost incurred for breaking up of rock to suitable sizes for reclamation is very expensive whereas the cost of hydraulic filling with marine fill is lower.


Related Discussions:- Show the benefits of adopting marine fill

Solid mensuration, Ask question #MiniThe base of an isosceles triangle and ...

Ask question #MiniThe base of an isosceles triangle and the altitude drawn from one of the congruent sides are equal to 18cm and 15cm, respectively. Find the lengths of the sides o

Compass surveying, Compass Surveying: You have studied about the compa...

Compass Surveying: You have studied about the compass and its use for bearings of measuring survey lines. The angular measurements are carried out with prismatic compass that

Calculate the amount put into saving account, Calculate the Amount put into...

Calculate the Amount put into Saving Account If you want to have $60,000 in 10 years, the amount that should be put into a 6.0% (effective annual rate) savings account now is m

Coagulation, incoming water contains 15 mg/L as a substance

incoming water contains 15 mg/L as a substance

Precaution of damp, i need simple ans for this question tell me precaution ...

i need simple ans for this question tell me precaution of dampness

Abc, uses concrete slump test

uses concrete slump test

Local vehicle parapet strong enough to contain vehicles, Q. Local vehicle p...

Q. Local vehicle parapet strong enough to contain vehicles? Majority of local parapets are 1.1m high in addition they are designed to resist impact from a 1.5ton car moving at

Determine the northing and easting coordinates, The northing and easting co...

The northing and easting coordinates for point C is most nearly:    Solution: Section the triangle and calculate using Pythagorean Theorem and the Law of Sine's or us

Raking piles of bridge abutment placed under an embankment, Question It sho...

Question It should be necessary that raking piles of a bridge abutment be placed under an embankment ? Answer For a bridge abutment to be supported on raking piles with div

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd