Sucker deck principle for changeable depth bridge decks, Civil Engineering

Assignment Help:

Question
What is the sucker deck principle for changeable depth bridge decks?

Answer
For a variable depth bridge deck, depth of continuous multi-span bridge deck is greater than before in pier supports and this absorbs sagging moments in a mid-span with consequent increase in hogging moments in pier supports. As a consequence, mid-span depth is able to be significantly concentrated due to reduction in sagging moment. In core, this sucker deck principle is applied in places where headroom requirement is of great concern. Moreover, in terms of structural presentation, sucker decks are effective in dropping dead loads than voided block of equivalent uniform depth for span length between 20 to 40meter. In necessities of aesthetics point of view, public be likely to value the structural form of arches and curved soffit somewhat than boring consistent deck alignment. Reference is completed to Brian Pritchard in 1992.

 

 


Related Discussions:- Sucker deck principle for changeable depth bridge decks

Determine the normal and shear stress elements, Determine the normal and sh...

Determine the normal and shear stress elements: The state of stress at a point is given through the stress components σ x = 70 MPa, σ y = 10 MPa, and τ xy = - 40 MPa. Using

Protection of lorry on the line, i. On single line by one or two men as req...

i. On single line by one or two men as required following and proceeding the lorry at a distance of 600 m. on the BG and 400 m. on the MG & NG carrying a banner flag across the tra

Constraction, sir what is means by share force

sir what is means by share force

What is the pre-tensioned concrete, What is the Pre-tensioned concrete ...

What is the Pre-tensioned concrete In Pre-tensioned concrete tendons are kept stretched with suitable mechanisms and concrete is cast into the forms through which stretched ten

Concrete cracking, Attached information shows construction details of a wat...

Attached information shows construction details of a water tank. The slab was poured in one pour and the walls (incl. Baffles) were poured in two even sections. Forms were stripped

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd