Show elastomeric bearings, Civil Engineering

Assignment Help:

1. Elastomeric bearings must not be placed one behind the other along the longitudinal axis of the girder on a single line of support under any circumstances.

2. Bearings of different plan size must not be installed next to each other (on the same pier) under the same girder/span.

Different plan area will lead to different value of 'δ' for given values of H, h and G as under:

3. The contact surface between the bearing and the bed block must be horizontal to avoid tangential force due to gravity coming on to the bearing (maximum tolerance 0.2%.


Related Discussions:- Show elastomeric bearings

Inspection and quality control certificate, Q. Inspection and Quality Contr...

Q. Inspection and Quality Control Certificate : A 'lot' under inspection should be accepted by the inspector when no defect is found in the acceptance level tests and so certif

Cement, Ask What is the density of cement?

Ask What is the density of cement?

Designing water storage tank, Question While designing water storage t...

Question While designing water storage tank , has movement joints be installed? Answer While designing water storage tanks , group joints can be set up in similar w

State the location and spacing of borings, Location and spacing of borings ...

Location and spacing of borings The location, spacing of geophysical profiles, soundings and borings should be such that,  you will be in a position to accurately predict the

Stabilised pavement layers, Stabilised Pavement Layers: Soil stabilis...

Stabilised Pavement Layers: Soil stabilisation is the process of treating a soil in such a manner as to alter and improve its properties for use as a pavement layer on sub-gr

Survey engineering, define the meaning of longitudinal cross sectional leve...

define the meaning of longitudinal cross sectional levelling

Illustrate bituminous surfacing over concrete structures, Q. Illustrate Bit...

Q. Illustrate Bituminous surfacing over concrete structures? Usage of bituminous surfacing over concrete structures (for instance existing concrete roads) is widespread to impr

Calculate the total duration for the four activity project, Calculate the T...

Calculate the Total Duration for the Four Activity Project Solution:      Scheduling work activity has associated time duration. The durations shown in the Table were e

Stability of column, what is end condition how effected length is calculate...

what is end condition how effected length is calculated

Define the precedence diagramming methods, Define the Precedence Diagrammin...

Define the Precedence Diagramming Methods a) Activity on Node (AON) with arrows for dependencies b) Uses all forms of precedence relationships

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd