1. Elastomeric bearings must not be placed one behind the other along the longitudinal axis of the girder on a single line of support under any circumstances.
2. Bearings of different plan size must not be installed next to each other (on the same pier) under the same girder/span.
Different plan area will lead to different value of 'δ' for given values of H, h and G as under:
3. The contact surface between the bearing and the bed block must be horizontal to avoid tangential force due to gravity coming on to the bearing (maximum tolerance 0.2%.
Continuous Flow Systems: Transport by road, rail, air or ships takes place in vehicles which move along a path at intervals. As against this, continuous flow systems are those
Question While designing sewer pipes , why vitrified clay pipes commonly is used for pipe size less than 600mm still as precast concrete pipes with PVC lining is used for pipe
Question What is key distinction in arranging pumps in series and in parallel? Answer For same pumps with similar functions, if pumps arranged in series, total head
Q. Define Hammer efficiency and coefficient of restitution? Hammer efficiency refers to ratio of kinetic energy of hammer to the rated energy (or potential energy). Basically i
What is the external load acting on a pre-stressed beam In the elastic range, a variation in the external load acting on a pre-stressed beam results in a change in the location
Uses of Cement Cement is utilized widely for the construction of several structures. Some of them are listed below: (i) Cement slurry is utilized for filling cracks in concr
Variations of tendon stresses in pre or post-tensioned concrete Variations of tendon stresses in pre or post-tensioned concrete members, along the length of tendons, may be of
what is elasticity
how to establish temporary benchmark
With a clear sketch indicate the system of protection of line for works of short duration where ‘ Stop dead restriction' need to be observed on a single line section on a BG track.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd