Calculate uniform annual cost for maintenance and repair, Civil Engineering

Assignment Help:

A contractor purchased a Caterpillar D-13 dozer for $100,000 and owned it for five years. The annual cost for maintenance and repair is provided in the Table. With annual interest rate at 7% and end-of-year disbursements, the uniform annual cost for maintenance and repair for the dozer is most nearly:

Year                 Maintenance and Repair Costs

1                                   $4,500

2                                  $9,000

3                                  $11,800

4                                  $13,500

5                                  $22,500

Solution:  The Equivalent Uniform Annual Cost (EUAC) can be computed for this irregular series of payments in two steps: 

Step 1:   Compute the Present Worth for five years using the single payment present worth factors.

PW of cost   = 4500(P/F, 7%, 1) + 9000(P/F, 7%, 2) + 11800(P/F, 7%, 3) +  13500(P/F, 7%, 4) + 22500(P/F, 7%, 5)

 = 4500(.9346) + 9000(.8734) + 11800(.8163) + 13500(.7629) + 22500(.7130)      

= $48,040.29

Step 2:   With the PW of cost known, compute the EUAC using the capital recovery factor.

  EUAC   = 48,040(A/P, 7%, 5)

      = 48,040(.2439) 

      = $11,717.03


Related Discussions:- Calculate uniform annual cost for maintenance and repair

Reinforcement detailing, i want to know about the detailing at beam -column...

i want to know about the detailing at beam -column joint & beam- wall joint

The senior project, I want to know what materials should I use for roofing ...

I want to know what materials should I use for roofing on the steel truss roof for a storage building 18x60 sqft

Trusses design, does the truss pitch relate to the building''s height?

does the truss pitch relate to the building''s height?

Preloading - control of settlements, Q. Preloading - Control of settlements...

Q. Preloading - Control of settlements? This method consists of loading the soil strata by a load intensity which will be equal to or higher than the expected load intensity. T

What are the causes of building collapse, The Passage of time is single rea...

The Passage of time is single reason. Buildings also collapse because of weak foundations. Earthquakes, hurricanes and other natural disasters can also damage the structure of the

Landslides - road under special conditions, Landslides: Landslides ar...

Landslides: Landslides are common in the Himalayan hill roads. The main causes contributing to landslides are: (a) Removal of lateral support at the bottom of a hill due t

What are the parasitic forces for prestressing, Q. What are the Parasitic f...

Q. What are the Parasitic forces for prestressing? In statically determinate structures, prestressing forces will cause the concrete structures to end upwards. Therefore precam

The covers of electrical machines are made of what materials, The covers of...

The covers of electrical machines are made of what materials ? Answer: It is made of  soft magnetic materials.

Various operations involved in maintenance by beater packing, Q. Explain in...

Q. Explain in details the various operations involved in Through Packing - conventional Maintenance by beater packing. Explain the various operations as per the Permanent Way

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd