Non-distortional prestressing, Civil Engineering

Assignment Help:

Non-distortional Prestressing

Concrete members deflect due to their own self weight. If prestressing force is applied in such a way that these deflections are eliminated due to the action of the prestressing force, it is called as non-distortional prestressing. In such a case, prestressing moments and self-weight moments balance each other and the concrete member is subjected to an axial force and bending moments due to externally applied loads only. 


Related Discussions:- Non-distortional prestressing

Determine the total active thrust by rebhann''s method, A retaining wall 3....

A retaining wall 3.6 m high supports a dry cohesion less backfill with a plane ground surface sloping upwards at a surcharge angle of 20° from the top of the wall. The back of the

Tension member, Explain various forms of tension members.

Explain various forms of tension members.

Determine the grain exact gravity, (i) A dry soil has a void ratio of 0.65 ...

(i) A dry soil has a void ratio of 0.65 and its grain exact gravity is = 2.80. What is its unit weight? (ii) Water is added to the sample so that its degree of saturation is 60%

Enumerate the term - failure due to crushing of concrete, Enumerate the ter...

Enumerate the term - Failure Due to Crushing of Concrete Over reinforced pre-stressed concrete members, provided with a large amount of pre-stressing steel or relatively small

Concrete, what is the heat of hydration and gel space ratio?

what is the heat of hydration and gel space ratio?

Define hammer efficiency and coefficient of restitution, Q. Define Hammer e...

Q. Define Hammer efficiency and coefficient of restitution? Hammer efficiency refers to ratio of kinetic energy of hammer to the rated energy (or potential energy). Basically i

Premix carpet open graded, what is premix carpet open graded and where is i...

what is premix carpet open graded and where is it used and what are its limitations ?

Calculate the final volume of the compacted soil, 1. 130,000-yd 3 of banke...

1. 130,000-yd 3 of banked soil from a borrow pit is stockpiled before being trucked to the jobsite. The soil has 18% swell and shrinkage of 8%.  The final volume of the compacted

Specification of water bound macadam road, Q. Specification of Water bound ...

Q. Specification of Water bound macadam road? Formation - The embankment for road shall be made to the cross section shown on the drawing. The bank shall be raised in regular

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd