Q. Asphalt mix design - durability vs. stability?
The main aim of asphalt mix design is to achieve a mix with economical blending of aggregates with asphalt to achieve the following:
(i) Workability to facilitate easy placement of bituminous materials without experiencing segregation;
(ii) Sufficient stability so that under traffic loads the pavement won't undergo distortion and displacement
(iii) Durability by having sufficient asphalt
(iv) Sufficient air voids
In asphalt mix design, high durability is generally attained at the expense of low stability. Therefore a balance has to be stricken between durability and stability requirements.
Sub-surface Drainage: Sub-surface drainage is intended to take away the water seeping through the pervious layers of the soil, causing a high water table, or in cut slopes of
i want the meaning of crete
the distance between two pegs M and N is 7,063 as measured on a slope. the height measured on the pegs are that M=1.814M and N=0.5687M
Construction of Embankment: The following steps describe embankment construction : (a) The ground is cleared and grubbed and all vegetation, grass, roots, etc. are removed
Define the term - post-tensioned concret In the Prescon and B.B.R.V. systems button heads are created at the ends of tendons. In the case of Prescon system, 2 to 130 tendon wir
Define Seal wear test of shock transmission unit? Seal wear test: Seal prevents the leakage of silicon putty in the cylinder. The test is conducted for 30000 cycles assuming th
Fluid Mechanics or Properties - Specific Gravity Dimensionless ratio of a fluid's density to some standard reference density. For liquids and solids, the reference density is p
Define friction
Q. Best efficiency point and operating point for pumps? In a pumping system, a system curve can be derived based on static head needed to lift up the fluid and variable head be
Project specifications require a relative compaction of 95% (modified Proctor). Construction of a highway embankment requires 10,000-yd 3 of fill. The borrow soil has an in-situ
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd