Q. Asphalt mix design - durability vs. stability?

The main aim of asphalt mix design is to achieve a mix with economical blending of aggregates with asphalt to achieve the following: 

(i) Workability to facilitate easy placement of bituminous materials without experiencing segregation;

(ii) Sufficient stability so that under traffic loads the pavement won't undergo distortion and displacement

(iii) Durability by having sufficient asphalt

(iv)  Sufficient air voids

In asphalt mix design, high durability is generally attained at the expense of low stability. Therefore a balance has to be stricken between durability and stability requirements.


Related Discussions:- Asphalt mix design – durability and stability

Utilisation of buoyancy effect, Q. Utilisation of Buoyancy Effect? Subm...

Q. Utilisation of Buoyancy Effect? Submerged part of the substructure will be subjected to buoyancy effect. The uplift pressure from the ground water can be utilised by constru

Why we need a high strength concrete in prestressing, Why we need a high st...

Why we need a high strength concrete in prestressing There is another aspect to why we need a high strength concrete in prestressing. Prestressed concrete is subjected to high

What is oil interceptors, Q. What is Oil interceptors ? Oils and Grease...

Q. What is Oil interceptors ? Oils and Grease are usually found in stormwater runoff from catchments. They come from spillage and leakage of fuels, lubricants, Vehicle coolants

Curves, procedure on conducting curves in field

procedure on conducting curves in field

Determine the allowable pressue, The data profile as shown in Figure is obt...

The data profile as shown in Figure is obtained. A best average of N values gave N 10 = 21, column loads including dead and live loads ranged from 500 kN to 950 kN. Determine the

Estimation of discharge, Estimation of Discharge: The estimation of d...

Estimation of Discharge: The estimation of discharge of a stream is necessary for determining the waterway, clearance and foundation details. Discharge is estimated from :

Reasons for blockage in pumping concrete, Q. Reasons for blockage in pumpin...

Q. Reasons for blockage in pumping concrete ? Concrete pumping is normally adopted in highly elevated locations for which access for concrete trucks is difficult. Construction

Mr Kamal Saxena, What is WBM road. How it is constructed?

What is WBM road. How it is constructed?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd