quantity calculation for subgrade preparation, Civil Engineering

Assignment Help:
reparation of subgrade in sqm for a road of span 12 km and width 5.25m,with shoulders of 0.75m span on both the sides...considering extrawidening too......plz help...i m preparing bill of quantities...and i need to calculate this quantity?

Related Discussions:- quantity calculation for subgrade preparation

Hydraulics assignment , I have assignment for hydraulics can you help for t...

I have assignment for hydraulics can you help for that

Types of cross-drainge structures, Types of Cross-drainage Structures: ...

Types of Cross-drainage Structures: The following are the types of cross-drainage structures : (a) Culverts, having waterway upto 6 m. (b) Minor Bridges, having waterwa

Chain survey, Instruments used in chain survey

Instruments used in chain survey

Designing sewer pipes, Question While designing sewer pipes , why vitr...

Question While designing sewer pipes , why vitrified clay pipes commonly is used for pipe size less than 600mm still as precast concrete pipes with PVC lining is used for pipe

Lagrange''s mean value theorem, Write some appplications of lagrange''s mea...

Write some appplications of lagrange''s mean value thorem

Distomat., write a note on distomat

write a note on distomat

Precast pile, when a precast pile is single point lifting and when double p...

when a precast pile is single point lifting and when double point lifting- what are the moment coefficient of them?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd