Show the specification of bricks, Civil Engineering

Assignment Help:

Q. Show the Specification of Bricks?

Specification of Ist class Bricks-

1. Table moulded and wire cut.

2. It should have edges and parallel faces.

3. If struck with hard substance it shall give ringing sound.

4. If soaked in water for 24 hrs. It should not absorb water 20% more than its dry weight.

5. If thrown on the hard surface or against other brick it should not break easily.

6. The standard size of brick shall be 19 x 9 x 9 cm. Or 9'' x 4½'' x 2 ¾''.

7. The tolerance in size shall be as follows - If 20 bricks stack is prepared the measurement shall be Length 368 to 392 cm. & Width & Height 174 to 186 cm.

8. Each brick shall have a frog of rectangular shape of size 4 x 10 x 1 or 2 cm. Deep or an oval shape of size 6 x 4 x 1 or 2 cm deep.

9. The minimum compressive strength of the brick shall be 105 kg / cm2.

10. Tempering of the clay and sand mixture shall be done in a pugging mill.

11. The burning shall be done in Kilns only.


Related Discussions:- Show the specification of bricks

Home, Ask question #Mindasfimum 100 words accepted#

Ask question #Mindasfimum 100 words accepted#

Construction - concrete pavement, Construction: Construction is usual...

Construction: Construction is usually done by one of the three methods: (a) Manual method, providing steel or wooden forms, pouring concrete and compacting by means of nee

Corrosion protection of lifting anchors in precast concrete, Q. Corrosion p...

Q. Corrosion protection of lifting anchors in precast concrete? Corrosion of lifting anchors in precast concrete units has to be prevented since the corroded lifting units caus

Pipelines, Pipelines: Use of Pipelines in Transport Pipelines...

Pipelines: Use of Pipelines in Transport Pipelines are used for transporting liquids (petroleum products for example), gases and solids in slurry form (for example ir

Stability of column, what is end condition how effected length is calculate...

what is end condition how effected length is calculated

Explain the process of directed track maintenance, Q. Explain the process o...

Q. Explain the process of Directed Track Maintenance? DTM is a method to maintain the track is directed every day and not as a prescribed routine. DTM essentially consists of n

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd