The process of installation of elastomeric bearing differs in case of precast vis-a-vis cast-in-situ girders. For precast girders, the bearing may be fixed to the underside of the girder by application of epoxy resin adhesives after specified surface preparation. Care should be taken to guard against faulty application and consequent behaviour of the adhesive layer as a lubricant.
The adhesive is considered merely as an installation device and is not an adequate anti- creep measure.
The process of installation of elastomeric bearing in a cast-in-situ girder is more complex. It involves the following stages:
1. Placing and adjusting the bearings on the bed block with required accuracy.
2. Preparation of a formwork sideframe all around the bearing.
3. Filling up the space between the bearing and the formwork frame by clean sand.
4. Placement of top forms over the side frame and sand with an opening matching the size and position of the bearing.
For a system Q =W+ ΔE where ΔE is the change in E, the stored energy in the ΔE system. E has various forms 1. Kinetic Energy 2. Potential Energy Work do
c programme for Venturimeter
What would be the best way to evaluate the field performance benefits of subsurface drainage in a flexible pavement? Short term and long term, thick or thin HMA..
A five-mile long section of two-lane road has an AADT of 8,000. There have been six crashes on this section of road during the past two years. What is the crash rate? R sec
how is total station used?
Determine the thermal stress in the bar: A stepped bar made of aluminum is held between two supports. The bar is 900 mm in length at 38ºC, 600 mm of which is having a diameter
in compression member [strut] why no deduction of area of rivet hole?
Traffic Surveys: The following traffic surveys are needed for preparing a good road project: Classified Volume Counts This survey is normally carried out for 7 days,
What are the principles of working from whole to part in surveying?
On a per pound basis, steel pipe is stronger in bending and is less likely to buckle in axial compression.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd