Incoming water contains 2.5 mg/L as a substance of natural alkalinity (HCO3-). The flow rate is 9.5 ML/day).
(a) What feed rate is required if the alum dose is 7 mg/L and is available with 87% purity.
(b) What is the annual cost of alum if it is available at $234 per Megagram (Mg).
Ans:
(a) Given that purity, P = 87% = 0.87
(b) Annual quantity cost of alum
Amount of alum needed per year = 76.4 Kg/day *365 day/year
= 27886 Kg/year = 27.886 Mg/year {1000 kg = 1 Mg)
Alum cost = 27.886*$234 = $6,525/year.
Design a continuous one-way solid slab supported on beams spaced at 4.2m o.c. the width of the beam is 300mm, leaving clear slab spans of 3.9. The slab carries a uniform DL= 6 KPa.
Brief explanation about cross sectional leveling
Ask question Design the pavement by group index method for heavy traffic using following subgrade data Soil passing 75micron sieve =65%,liquid limit =40%plastic limit =20% #Min
Estimate the Activity Durations The total labor cost for emergency bridge rehabilitation on an interstate highway is $5,716,440. The average crew-hour cost is $15,879 for this
1) A propped cantilever beam ABC is 7m long.It has the point C fixed and Point A on a roller support.It carries a 200Kn point load at a distance 3m from A.There is a moment of 80KN
Resultant Force on a Given Area of an Inclined Plane The resultant force is calculated from the average pressure: R = (AVERAGE P)(A)
Q. Lifting hoops in precast concrete - mild steel vs. high yield steel Strength of high yield steel is undoubtedly higher than mild steel and therefore high yield steel is gen
Q. Temporary Repairs to rail fracture? If a welding party is not readily available, the fracture shall be repaired by using a cut-rail (not less than 4 meter long) and clamped/
Ask questa) In an unloaded propped cantilever, the propped end sinks vertically relative to the fixed end by an amount ? due to poor construction of the foundation of the prop. Wha
Softening Point Test: The temperature at which bitumen softens is determined by the "Ring and Ball" test (Figure). (a) Diagram of Apparatus at Beginning of Test (b
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd