What are some facts about concrete, Civil Engineering

Assignment Help:

Actually, drying is not directly linked to hardness in concrete. After concrete is poured, putting it in a wet environment by spraying it constantly with water will hasten its hardening and its curing. After concrete cures, it is hard.

 


Related Discussions:- What are some facts about concrete

Common defects - bituminous roads, Common defects - bituminous roads: ...

Common defects - bituminous roads: Cracks can be filled with a bitumen emulsion. Wide cracks can be filled with premix sand asphalt. If an overlay is to be laid on a cracke

Mechanics problem, i am facing some problem in solving the problem of elong...

i am facing some problem in solving the problem of elongation due to self weight suspended from fixed support in the conical bar

Explain the shrink factor of soil, Explain the Shrink Factor of Soil In...

Explain the Shrink Factor of Soil In addition to the swell factor and its associated load factor, soil also has a shrink factor. While the first two relate the volume of an equ

Calculation of crack widths arising from thermal movement, Q. Calculation o...

Q. Calculation of crack widths arising from thermal movement In the calculation of thermal movement, the below formula is used in most codes: w max =s x a x (T 1 +T 2 )/2

Digit of cells for concrete box girder bridges, Question How does an engine...

Question How does an engineer determine digit of cells for concrete box girder bridges ? Answer If depth of a box girder bridge exceeds 1/6 or 1/5 of bridge width, then it is o

Determine the stage of cracking moment of pre-stress, Determine the stage o...

Determine the stage of Cracking moment of pre-stress  At the stage of transfer of pre-stress in the pre-stressed beam element, only the pre-stressing force and the self weight

What is long welded rail, Q. What is Long Welded Rail? Long Welded Rail...

Q. What is Long Welded Rail? Long Welded Rail is a welded rail the central part of which dose not under go any longitudinal movement due to temperature variation, normally a le

How to calculate the combined stresses, Compute the stresses at top and bot...

Compute the stresses at top and bottom fibers in a simply supported pre-stressed concrete beam with a rectangular cross section, 250 mm wide and 450 mm deep, as shown in Figure, at

Total volume of soil that excavated from the borrow area, Project specifica...

Project specifications require a relative compaction of 95% (modified Proctor).  Construction of a highway embankment requires 10,000-yd 3 of fill.  The borrow soil has an in-situ

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd