Question

What are main dissimilarities in function between rock anchors and rock sockets?


Answer

Rock anchors are used first and foremost for resisting uplift forces. On contrary, rock sockets serve three major reasons-

(i) Rock socket friction and end bearing to oppose vertical load;

(ii) Inert conflict of rock sockets contribute to resistance of lateral load; and

(iii) Socket shaft resistance is also used for resist uplifting forces. But only 70 percent of this ability has to be used because of effect of unenthusiastic Poisson ratio.

 


Related Discussions:- Dissimilarities in function b/w rock anchors and rock socket

Cement Sand Plaster, How to use plaster cement in sand?  Cement sand pl...

How to use plaster cement in sand?  Cement sand plaster is a layer of cement & sand mortar that is applied over walls made of brickwork, cement block work, RCC walls and RCC co

Construction - concrete pavement, Construction: Construction is usual...

Construction: Construction is usually done by one of the three methods: (a) Manual method, providing steel or wooden forms, pouring concrete and compacting by means of nee

Steps to determine brake (bhp) and motor horsepower (mhp), Steps to determi...

Steps to determine the brake (bhp) and motor horsepower (mhp):  1) Determine water horsepower (whp). h A (Qgpm) (SG) / 3956 OR h A (Qcfs) (SG) / 8.814 2) Apply the pump

Laplace transform, Using Laplace transfom, the following differential equat...

Using Laplace transfom, the following differential equation d y dy dt reduces to the algebraic equation of the form Resolve y(s) into partial fractions

Sub-base layer be served as a drainage layer , Question Would a sub-bas...

Question Would a sub-base layer be served as a drainage layer to take away water from pavement? Answer As well providing load distribution in post-construction stage a

Dynamics202, Determine the minimum speed of the stunt rider, so that when h...

Determine the minimum speed of the stunt rider, so that when he leaves the ramp at A he passes through the center of the hoop at B. [5 Points] 2. How far h should the landing ramp

State the coulomb earth pressure theory, A masonry wall with vertical back ...

A masonry wall with vertical back has a backfill 5 m behind it. The ground level is horizontal at the top and the ground water table is at ground level. Measured the horizontal pre

How can a temporary diversion to laid, Q. How can a temporary diversion to ...

Q. How can a temporary diversion to laid a cross flowing river in case of disruption to rail traffic over a major bridge lasting over 6 months. Ans.- Temporary diversion

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd