State the term - failure due to strain, Civil Engineering

Assignment Help:

State the term - Failure Due to Strain

In most of  the cases of pre-stressed concrete construction, the failure of underreinforced and lightly reinforced members shall take place when the concrete reaches a limiting strain of 0.0035. At this stage, the steel may be stressed in the plastic range.

 


Related Discussions:- State the term - failure due to strain

Beam stress, what is the bending stress for a simply supported beam with th...

what is the bending stress for a simply supported beam with three equal concentrated loads that are equally spaced?

Determine the governing effective length of a steel column, Determine the g...

Determine the governing effective length of a steel column? Determine the governing effective length of a W12 x 106 steel column that is 12' high, pinned at each end, and

Define the types of sedimentation, Define the Types of Sedimentation 1....

Define the Types of Sedimentation 1. Type I Particles that settle discretely (settle as individual particles) sand, grit Pre-sedimentation for sand prior to co

Graphics, 1. Draw the projections of a line AB that is 50 mm long and is pa...

1. Draw the projections of a line AB that is 50 mm long and is parallel to both the HP and the VP. The line is 40 mm above the HP and 25 mm in front of the VP. 2. A line AB, 50 mm

Maintenance of airport pavements, Maintenance of Airport Pavements: ...

Maintenance of Airport Pavements: Maintenance Elements The maintenance of airport pavements is an important task of a civil engineer, since the safe movement of aircr

Distomat, short note about characteristics of distomat

short note about characteristics of distomat

REQUIREMENT OF GOOD BUILDING STONE, HOW TO MAKE A GOOD BUILDING .? TELL ABO...

HOW TO MAKE A GOOD BUILDING .? TELL ABOUT SOME TIPS OF REQUIREMENT OF GOOD BUILDING STONE? AND SAY ABOUT CEMENT?

Survey, what is road survey ?

what is road survey ?

Surveying, Distance ABC was measured with a 30m. Chain tested and found to ...

Distance ABC was measured with a 30m. Chain tested and found to be correct in the beginning of the work .after measuring AB=1.2 km chain was found to be 10 cm. To long chaining was

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd