Minimum and maximum area of reinforcement, Civil Engineering

Assignment Help:

Q. Minimum and maximum area of reinforcement?

Minimum area of reinforcement vs. maximum area of reinforcement

Beams can be designed to be larger than required for strengthconsideration because of aesthetics or other reasons. As such, corresponding steel ratio is very low and moment capacity of pure concrete section based on the modulus of rupture is higher than its ultimate moment of resistance. Consequently reinforcement yields first and extremely wide cracks will be formed. A smallest area of reinforcement is specified to avoid the formation of wide cracks.

Contrariwise, a maximum area of reinforcement is specified to allow the placing and compaction of fresh concrete to occur easily.


Related Discussions:- Minimum and maximum area of reinforcement

Flash point test, Flash Point Test: The flash point is the temperatur...

Flash Point Test: The flash point is the temperature at which the bitumen gives off vapours which ignite in the presence of a flame. The flash point temperature gives the cri

Determine the major and minor principal effective stresses, The stresses ac...

The stresses acting on the plane of maximum shearing stress by a given point in sand are as follows: total normal stress = 250 kN/m 2 ; pore-water pressure = 88.5 kN/ m 2 ; shearin

Advance structure engg, need help for assignment that requires strand 7 and...

need help for assignment that requires strand 7 and autocad

Classification of timber based on availability:, Classification Based on Av...

Classification Based on Availability: Forest departments categorized timbers based on the availability as X=Most common. 1415 m 3 or more per year Y=Common. 355 m 3 to 1415

Soil particles for geotechnical design, Question Will it worthwhile to ...

Question Will it worthwhile to take out tests on particle density of soil particles for geotechnical design? Answer Particle density of soils is definite by ratio of

STRUCTURAL MECHANICS, Define and explain Mohr’s theorem for finding slope a...

Define and explain Mohr’s theorem for finding slope and deflection.

Lead products in construction, What are the advantages and disadvantages of...

What are the advantages and disadvantages of lead products in construction? Ans) Disadvantages: -Lead is very toxic; its use can result in pollution of the ground and more signi

Whole barings, Ask question #Minexaple of wholeiwhole baring 100 words acce...

Ask question #Minexaple of wholeiwhole baring 100 words accepted#

I.s. codes on earthquake resistant building design, I.S. CODES ON EARTHQUAK...

I.S. CODES ON EARTHQUAKE RESISTANT BUILDING DESIGN Bureau of Indian Standard has divided the country into five zones depending upon the severity of earthquake after observing

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd