Minimum and maximum area of reinforcement, Civil Engineering

Assignment Help:

Q. Minimum and maximum area of reinforcement?

Minimum area of reinforcement vs. maximum area of reinforcement

Beams can be designed to be larger than required for strengthconsideration because of aesthetics or other reasons. As such, corresponding steel ratio is very low and moment capacity of pure concrete section based on the modulus of rupture is higher than its ultimate moment of resistance. Consequently reinforcement yields first and extremely wide cracks will be formed. A smallest area of reinforcement is specified to avoid the formation of wide cracks.

Contrariwise, a maximum area of reinforcement is specified to allow the placing and compaction of fresh concrete to occur easily.


Related Discussions:- Minimum and maximum area of reinforcement

Structure, what is the cutelment length

what is the cutelment length

Determine the variation of safe bearing capacity of soi, State the algebrai...

State the algebraic equations showing the variation of safe bearing capacity of soil (for clay and sand to be given separately) in shallow foundation with: (i) depth of foundati

Whole barings, Ask question #Minexaple of wholeiwhole baring 100 words acce...

Ask question #Minexaple of wholeiwhole baring 100 words accepted#

Explain the soil texture and soil structure, (a) Explain the 'Soil Texture'...

(a) Explain the 'Soil Texture' and 'Soil structure'. What are the various terms used to explain the above properties of the soil? (b) A clay sample having natural moisture conte

Marine pilling, what are the problems in traditional marine pilling system ...

what are the problems in traditional marine pilling system of steel tubular pile with concrete infill

PORTAL FRAME, EXPLAIN SITUATION OF THE PORTAL FRAME CAN CAUSE SWAY WITH THE...

EXPLAIN SITUATION OF THE PORTAL FRAME CAN CAUSE SWAY WITH THE AID OF A DIGRAM

Characteristic strength of concrete, In addition to its own weight, the bea...

In addition to its own weight, the beam in Figure is to carry a uniformly distributed live load of 12 kN/m. Figure 1 also shows the cross-sectional details of the beam. Design a

Construction mesurment, Measurement quantity of excavation, concrete, formw...

Measurement quantity of excavation, concrete, formwork as my assignment brief.

Difference between direct circulation and reverse drilling, Question Wh...

Question What is main difference between direct circulation drilling and reverse circulation drilling? Answer In straight circulation drilling and reverse circulati

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd