Types of Surveys and Investigations:
For preparing a good road project, the following surveys and investigations are needed:
(a) Traffic Surveys
(b) Topographical Surveys
(c) Drainage Studies
(d) Soil Surveys
(e) Pavement Investigations
Of these, soil surveys will be dealt with in Unit 3, and Pavement Investigations will be dealt with in further.
do u do drawing assignment ( 3rd angle projection)
If the resultant forces are resolved in the three co-ordinate directions and divided by the area of the face of the cube we have the general state of 3-dimensional stress as shown.
What are the principles of working from whole to part in surveying?
Define Equipments required for conducting UWMT? Equipments required for conducting UWMT are: Inspection Equipment: a) Electronic yoke with power cable b) Ground fault interr
how to understand maps easily?
centroid of shaded area
Enumerate the Variation in tendon stress In post-tensioned construction, several tendons are simultaneously stretched and anchored at the ends. It is assumed that all tendons
what is a couple?
Question Designing of access ramps for drainage channels, why must direction of access ramps is sloping down on the way to downstream ? Answer In designing of access
show that Y = 4e2x - 2e-3x is a solution of initial-value problem (d2y)/(dx2)+ (dy)/(dx) - 6y=0 ; y(0)=6 ; y’(0)=2 . is Y = 2e2x - 4e-3x also a solution of this proble
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd