Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Explain National Contingency Plan (NCP)
- Provides detailed direction on the action to be taken at a hazardous waste site, including emergency actions and a method to rank sites to establish future actions
- NCP describes the steps to be taken for the detailed evaluation of the risks associated with a site, termed a remedial investigation(RI). The process of selecting an appropriate remedy is termed the feasibility study(FS).
- Specifies the degree of cleanup to be selected in accordance with several criteria.
- There is no predetermined level of remediation that can be required or that must be achieved at a particular site.
- The degree of correction is established on a site-by-site basis.
- Upon completion and approval of the RI/FS, the preparation of the selected remedy is planned out in the remedial design.
Determine the loss of fluid energy as 310 gallons per minute (gpm) of water flows through 1,000 ft of 4 inch, schedule-40 welded and seamless steel pipe. The fluid temperature is 5
what is the design of syphon
HOW CAN I INVESTIGATE THE PROPERTIES UNBURNT COMPRESSED CLAY BRICKS AND STABILIZED UNBURNT COMPRESSED BRICKS.
Methods of Constructing Roads in Marshy Areas: The following methods are adopted for constructing roads in marshy areas: (a) Removal of soft soil and replacement with good
how to understand maps easily?
how to measure horizontal angle by theodolite
Ask question Design the pavement by group index method for heavy traffic using following subgrade data Soil passing 75micron sieve =65%,liquid limit =40%plastic limit =20% #Min
what precaution taken during the mixing of crush sand in winter season
how to calculate carbon intensity?
Project specifications require a relative compaction of 95% (modified Proctor). Construction of a highway embankment requires 10,000-yd 3 of fill. The borrow soil has an in-situ
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd