Explain national contingency plan (ncp), Civil Engineering

Assignment Help:

Explain National Contingency Plan (NCP)

- Provides detailed direction on the action to be taken at a hazardous waste site, including emergency actions and a method to rank sites to establish future actions

- NCP describes the steps to be taken for the detailed evaluation of the risks associated with a site, termed a remedial investigation(RI).  The process of selecting an appropriate remedy is termed the feasibility study(FS).

- Specifies the degree of cleanup to be selected in accordance with several criteria.

- There is no predetermined level of remediation that can be required or that must be achieved at a particular site.

- The degree of correction is established on a site-by-site basis.

- Upon completion and approval of the RI/FS, the preparation of the selected remedy is planned out in the remedial design.


Related Discussions:- Explain national contingency plan (ncp)

Determine the loss of fluid energy, Determine the loss of fluid energy as 3...

Determine the loss of fluid energy as 310 gallons per minute (gpm) of water flows through 1,000 ft of 4 inch, schedule-40 welded and seamless steel pipe. The fluid temperature is 5

Syphon, what is the design of syphon

what is the design of syphon

PROJECT PROPOSAL, HOW CAN I INVESTIGATE THE PROPERTIES UNBURNT COMPRESSED C...

HOW CAN I INVESTIGATE THE PROPERTIES UNBURNT COMPRESSED CLAY BRICKS AND STABILIZED UNBURNT COMPRESSED BRICKS.

Methods of constructing roads in marshy areas, Methods of Constructing Road...

Methods of Constructing Roads in Marshy Areas: The following methods are adopted for constructing roads in marshy areas: (a) Removal of soft soil and replacement with good

Mapping, how to understand maps easily?

how to understand maps easily?

Higway engineering, Ask question Design the pavement by group index method ...

Ask question Design the pavement by group index method for heavy traffic using following subgrade data Soil passing 75micron sieve =65%,liquid limit =40%plastic limit =20% #Min

Concrete with crush sand, what precaution taken during the mixing of crush ...

what precaution taken during the mixing of crush sand in winter season

Total volume of soil that excavated from the borrow area, Project specifica...

Project specifications require a relative compaction of 95% (modified Proctor).  Construction of a highway embankment requires 10,000-yd 3 of fill.  The borrow soil has an in-situ

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd