Differences between pipe jacking and micro-tunnelling, Civil Engineering

Assignment Help:

Q. Differences between pipe jacking and micro-tunnelling?

Pipe jacking is a general scheme of installation of pipes with a tunnelling shield in front and the pipes are jacked from a jacking pit toa receiving pit. Tunnelling shield for pipe jacking can be mechanical and electrical equipment for conducting the excavation work or itcould be a manual shield for workers going inside the shield to do manual excavation. For microtunneling, it is a type of pipe jacking of small sized non-man-entry pipes that are remotely controlled. Generally there are two general kinds of micro-tunnelling machines:

(ii) Pressurised slurry

Similar to Pressurised slurry TBM, excavated material is transported from excavation face to surface suspended in aslurry. 

(iii)Auger machine

Excavated material is transported from excavation face to drive pit by a cased screw auger.


Related Discussions:- Differences between pipe jacking and micro-tunnelling

Building material, what is grillege foundation and where are use

what is grillege foundation and where are use

Explain in brief about the term - anchorage, Explain brief about the term -...

Explain brief about the term - Anchorage A device used to anchor tendons at the end of a concrete member is called as an anchorage in the case of post-tensioned concrete. In th

Determine the equivalent of free float, The free float is equal to: a. L...

The free float is equal to: a. Latest allowable event occurrence time + Early finish time b. Earliest event occurrence time + early finish time c. Latest allowable event o

Methods of design of prestressed concrete member, Methods of design of pres...

Methods of design of prestressed concrete member What are different approaches or methods of design of prestressed concrete members? What are important considerations  in th

Steel overlap in columns, where we can overlap steel in columns if we use ...

where we can overlap steel in columns if we use 50 or 60 bar diameter as overlap length.

Piers and piles, what is the difference between piers and piles?

what is the difference between piers and piles?

Calculate the daily standard production rate of equipment, Calculate the Da...

Calculate the Daily Standard Production Rate of Equipment An excavator with a bucket capacity of 3-yd 3 has a standard operating cycle time of 40 seconds. The daily standard p

Why we use air valves, Q. Why we use Air Valves? Air Valves - Air valve...

Q. Why we use Air Valves? Air Valves - Air valves of proper size and pressure rating at summits. Air valves ensure the safety of the pipe line against collapse when at points o

Function of waterproof membrane for concrete carriageway, Q. Function of wa...

Q. Function of waterproof (or separation) membrane for concrete carriageway A layer of waterproof (or separation) membrane is usually placed between sub-base and concrete slab

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd