How to construct a reinforced concrete foundation, Civil Engineering

Assignment Help:

A clay layer 24 metres thick has a saturated unit weight of 18 kN/m3. Ground water level occurs at a depth of 4 metres. It is proposed to construct a reinforced concrete foundation, length 48 m and width 12 m, on the top of the layer, transmitting a uniform pressure of 180 kN/m2. Determine the settlement under its centre.  E for the clay is 33 MN/m2 obtained from triaxial tests. Initial void ratio = 0.69. Change in void ratio = 0.02.

 


Related Discussions:- How to construct a reinforced concrete foundation

Define the meaning of grout - concrete, Define the meaning of Grout - Concr...

Define the meaning of Grout - Concrete Grout should be made with any type of recommended cement and using water of a required quality. If very large size ducts are to be groute

Pattern of load distribution of piles in such agreement, Question For a...

Question For a rigid pile cap with vertical piles at middle and raking piles at the sides, what is pattern of load distribution of piles in such agreement? Answer Becau

Necessity of air voids in bituminous pavement, Q. Necessity of air voids in...

Q. Necessity of air voids in bituminous pavement? If the presence of air voids is too high, it results in an increase of permeability of bituminous pavement. This enables the f

Define the working of ground penetrating radar, Define the Working of Groun...

Define the Working of Ground Penetrating Radar? Ground penetrating radars (GPR) and low frequency sound are also used in scour survey. These are good in shallow water but not v

Water absorption test for precast concrete pipes, Purpose of carrying out w...

Purpose of carrying out water absorption test for precast concrete pipes Cement will mix with more water than is essential to ultimately combine during hydration of cement pas

Determine the equivalent of free float, The free float is equal to: a. L...

The free float is equal to: a. Latest allowable event occurrence time + Early finish time b. Earliest event occurrence time + early finish time c. Latest allowable event o

#Paint, whats the mix ratio or proportion of paint components for 1litre

whats the mix ratio or proportion of paint components for 1litre

Dam, Check for stability in a dam

Check for stability in a dam

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd