How to construct a reinforced concrete foundation, Civil Engineering

Assignment Help:

A clay layer 24 metres thick has a saturated unit weight of 18 kN/m3. Ground water level occurs at a depth of 4 metres. It is proposed to construct a reinforced concrete foundation, length 48 m and width 12 m, on the top of the layer, transmitting a uniform pressure of 180 kN/m2. Determine the settlement under its centre.  E for the clay is 33 MN/m2 obtained from triaxial tests. Initial void ratio = 0.69. Change in void ratio = 0.02.

 


Related Discussions:- How to construct a reinforced concrete foundation

Verify the coefficient of elastic uniform compression, Verify the coefficie...

Verify the coefficient of elastic uniform compression if a vibration test on a concrete block of 1 m cube gave a resonant frequency of 36 Hz in vertical vibration. The weight of

How should reservoir floors be designed, Question In designing of servi...

Question In designing of service reservoirs, how should reservoir floors be designed to avoid leakage of water because of seasonal and shrinkage movements ? Answer I

Show the design of howe truss, Q. Show the Design of Howe truss? Design...

Q. Show the Design of Howe truss? Design of Howe truss is the opposite to that of Pratt truss in that the diagonal members are slanted in the direction opposite to that of Prat

Define the approach velocity, Define the Approach Velocity Typical prob...

Define the Approach Velocity Typical problems have negligible approach velocity.  v 1 = Q/A, where A = the cross-sectional area of flow in the channel. The value is not the ve

Explain tension and compression anchorage length, Q. Explain Tension and co...

Q. Explain Tension and compression anchorage length? Tension anchorage length vs. compression anchorage length Tension anchorage length of steel reinforcement in concrete

What is activated sludge process, Q. What is Activated Sludge process? ...

Q. What is Activated Sludge process? The term Activated Sludge is used to indicate the sludge which is obtained by settling sewage in presence of abundant oxygen. The Activated

Advantages of unbonded post-tensioning systems, Advantages of unbonded post...

Advantages of unbonded post-tensioning systems Similarly, some advantages of unbonded post-tensioning systems over bonded post-tensioning ones may be written as under :  (a)

Purpose of using capping layers in pavement construction, Q. Purpose of usi...

Q. Purpose of using capping layers in pavement construction? When California Bearing Ratio of subgrade is checked to be below a specific percentage (for example 5%), a capping

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd