How to construct a reinforced concrete foundation, Civil Engineering

Assignment Help:

A clay layer 24 metres thick has a saturated unit weight of 18 kN/m3. Ground water level occurs at a depth of 4 metres. It is proposed to construct a reinforced concrete foundation, length 48 m and width 12 m, on the top of the layer, transmitting a uniform pressure of 180 kN/m2. Determine the settlement under its centre.  E for the clay is 33 MN/m2 obtained from triaxial tests. Initial void ratio = 0.69. Change in void ratio = 0.02.

 


Related Discussions:- How to construct a reinforced concrete foundation

Determine condition of activity in the network flow diagram, Determine the ...

Determine the condition of each activity in the network flow diagram shown below   Ans: a. Activity C can be started only after the completion of activities A and

Surveying, WCB from included angle

WCB from included angle

Planning of water transport facilities, Planning of Water Transport Facilit...

Planning of Water Transport Facilities: Definition of Terms In water transport system, a number of terms are used. It is necessary for a civil engineer to know the pr

#high way engineering about road pavements.., what is the function of longi...

what is the function of longitudinal joints in concrete road pavements?

Determine the ruthann graphical method, A retaining wall with a vertical ba...

A retaining wall with a vertical back 5 m high supports cohesion less backfill of unit weight of 19 kN/m 3 . The upper surface of the backfill rises at an angle of 10° with the hor

Matrices, How to invert a matrix

How to invert a matrix

Construction of passenger terminal building, Construction of Passenger Term...

Construction of Passenger Terminal Building: There are various concepts in planning and constructing passenger terminal buildings. These are : (a)        The international

Graphics, 1. Draw the projections of a line AB that is 50 mm long and is pa...

1. Draw the projections of a line AB that is 50 mm long and is parallel to both the HP and the VP. The line is 40 mm above the HP and 25 mm in front of the VP. 2. A line AB, 50 mm

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd