How to construct a reinforced concrete foundation, Civil Engineering

Assignment Help:

A clay layer 24 metres thick has a saturated unit weight of 18 kN/m3. Ground water level occurs at a depth of 4 metres. It is proposed to construct a reinforced concrete foundation, length 48 m and width 12 m, on the top of the layer, transmitting a uniform pressure of 180 kN/m2. Determine the settlement under its centre.  E for the clay is 33 MN/m2 obtained from triaxial tests. Initial void ratio = 0.69. Change in void ratio = 0.02.

 


Related Discussions:- How to construct a reinforced concrete foundation

Moment distribution method hinges, Analyse the continuous beam using moment...

Analyse the continuous beam using moment distribution. A continuous beam ABCDE fixed at A carry a load of 2KN one metre from A at AB 3m. BC 3m, carry a UDL of 3KN/m and hinge at

Hydrographic data for design of bridge, Q.What Hydrographic data required f...

Q.What Hydrographic data required for Design of bridge? (i) Design discharge for bridge waterway and foundation with corresponding high flood levels. Frequency curve for annual

Darwing, construction the ellips in all method

construction the ellips in all method

Rainfall-runoff computation, hi sir. i hope every thing is fine with you. I...

hi sir. i hope every thing is fine with you. I want to have an information about the way how to compute stream flow from the rainfall over the catchment and anso need the way how t

Explain the driver expectancy, Explain the Driver Expectancy A fundamen...

Explain the Driver Expectancy A fundamental component of driver information processing and perception. Drivers operate with a set of expectancies, e.g.: 1) Freeway exits wil

Explain the routine inspections - inspection of bridge, Explain the Routine...

Explain the Routine inspections - inspection of bridge? These determine the physical and functional condition of the structure, identifying changes from the inventory, baseline

Preloading - control of settlements, Q. Preloading - Control of settlements...

Q. Preloading - Control of settlements? This method consists of loading the soil strata by a load intensity which will be equal to or higher than the expected load intensity. T

Paints., contituents of paints

contituents of paints

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd