finite elemenst, Civil Engineering

Assignment Help:
can you do finite elements using the weighted residual formulation-galerkin method?

Related Discussions:- finite elemenst

What is the main reason being for the phenomenon, Sometimes side of concret...

Sometimes side of concrete bridges is observed to turn black in colour . What is the main reason being for the phenomenon ?

Define the meaning of grout - concrete, Define the meaning of Grout - Concr...

Define the meaning of Grout - Concrete Grout should be made with any type of recommended cement and using water of a required quality. If very large size ducts are to be groute

What is the negative skin friction, A square pile group of 16 piles passes ...

A square pile group of 16 piles passes by a filled up soil of 3 m depth. The pile diameter is 25 cm and pile spacing is 75 cm. If the unit cohesion of the material is 18 kN/m 2 an

Surveying, description of instruments used transfer upper floors *plumb-bob...

description of instruments used transfer upper floors *plumb-bob method *theodolite method *theodolite and target method *optical plumbing method

Define the limitations of shock transmission unit, Define the Limitations o...

Define the Limitations of shock transmission unit? STUs are not intended for energy/shock absorption. They simply transmit load from one part of the structure to another thus s

Barometric leveling, what are advantages and disadvantages of barometric le...

what are advantages and disadvantages of barometric levelling

Define well steoning, Q. Define Well Steoning? It is the side wall of w...

Q. Define Well Steoning? It is the side wall of well foundation. It is built of masonry or cement concrete not less than M 10 grade, sufficient bond rods should be provided to

Explain the design of waterway, Q. Explain the Design of waterway? When...

Q. Explain the Design of waterway? When the river flows between high banks and the whole width is actively functioning during high floods, the bridge waterway should practicall

Total volume of soil that excavated from the borrow area, Project specifica...

Project specifications require a relative compaction of 95% (modified Proctor).  Construction of a highway embankment requires 10,000-yd 3 of fill.  The borrow soil has an in-situ

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd