Precast concrete manholes are generally constructed by placing the bases of manholes firstly. Walls of precast manholes are formed by placing the precast concrete rings one on top of other up to the required height. Someone can notice that reinforcement used for resisting the lateral earth pressure and surface loads aren't considered in a number of designs. It is discussed in Concrete Pipe Association of Great Britain which analysis of soil pressures shows that standard unreinforced precast units are capable of resisting uniformly distributed pressures (for example loading condition in a manhole) down to a depth of 150m. If very great road traffic and side loads are encountered, an extra concrete surround of about 150mm may be provided.

109_Necessity of reinforcement in precast concrete manhole units.png

Fig: A precast concrete manhole

 


Related Discussions:- Necessity of reinforcement in precast concrete manhole units

Geo Technical Project, I have a geo technical Project that I need to be sol...

I have a geo technical Project that I need to be solved correctly and accurately within 15 hours exact, please. Steps and details must be included. Thanks a lot and let me know ASA

Fy steel, what is the yield stress for reinforcement steel?

what is the yield stress for reinforcement steel?

Residents building g+3, How analysis of residents building g+3 structure an...

How analysis of residents building g+3 structure analysisl

Define the combustion of solid waste, Define the Combustion of Solid Waste?...

Define the Combustion of Solid Waste? A chemical reaction in which the elements in fuel oxidize in presence of excess oxygen C → CO 2 , H → H 2 O, S   → SO x , N → NO x

Explain the primary treatment for wastewater, Explain the Primary Treatment...

Explain the Primary Treatment for Wastewater Primary Treatment: to remove the pollutants that floats or settles. Typically 60% of suspended solids and 35% of BOD 5 are removed

Chain surveying, Explain me about obstacles in chain surveying and what is ...

Explain me about obstacles in chain surveying and what is meant by cross staff,offsets?

Quadratics.., applying quadratics in civil engineering

applying quadratics in civil engineering

Determine the maximum pressure at the base of the wall, A masonry retaining...

A masonry retaining wall of trapezoidal section with the vertical face on the earth side is 1.5 m wide at the top and 3.5 m wide at the base and is 5.0 m high. It retains a sand fi

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd