Key functions of changed components of paint, Civil Engineering

Assignment Help:

Question

What are key functions of changed components of paint?


Answer


For regular paint application, there are largely three key components of paint, namely primer, undercoat and finishing coat.

Primer- This is first layer of a typical painting system and it is used to occupy corrosion and provide a fine bond for subsequent coats.

Undercoat-This module acts as a barrier to corrosion agents and even out misdeed of bonding surface. It also serves to secrete underlying conditions and stop details and colour of area of application to affect designed colour and finishing facts of paint.

Finishing coat- This is final layer of a typical painting system and it protects underlying layers from an effect of difficult weather conditions and to supply designed properties of paint like colour, impermeability, wearing resistance and so on.

 

 


Related Discussions:- Key functions of changed components of paint

Cone, if the diameter of the base remains constant by what factor should th...

if the diameter of the base remains constant by what factor should the altitude be multiplied to produce a cone with twice volume as the original

Define about the inclined borings, Define about the Inclined Borings In...

Define about the Inclined Borings Inclined  brings may also be used in exploration of  inclined strata and for the detection of weak pockets (lenses),  buried channels,  caviti

Maintenance of bituminous roads, Maintenance of Bituminous Roads: The...

Maintenance of Bituminous Roads: The common defects noticed in a bituminous road are : potholes cracks rutting corrugations shoving stripping and l

TIMBER PILE, ADVANTAGE AND DISADVANTAGE OF TIMBER PILE

ADVANTAGE AND DISADVANTAGE OF TIMBER PILE

Concrete surface finish - limitations of ultrasonic system, Define Concrete...

Define Concrete Surface Finish - Limitations of Ultrasonic System? The smoothness of the surface under test is important to ensure proper acoustical contact between the transdu

Geodesy, what is the difference between geodesy and plane survey

what is the difference between geodesy and plane survey

Determine the final volume of the compacted soil, 30,000-yd 3 of banked so...

30,000-yd 3 of banked soil from a borrow pit is stockpiled before being trucked to the jobsite.  The soil has 28% swell and shrinkage of 18%.  The final volume of the compacted so

Fluid mechanism, tell me something about velocity profile?

tell me something about velocity profile?

Irrigation, what is a balancing depth

what is a balancing depth

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd