Question
What is the reason that vibrators not used in concrete compaction in piling works?
Answer Concrete for piles must be a high-slump self-compacting mix that is capable of flowing between reinforcement cages with simplicity. As concrete is designed to be self-compacting, vibrators are not used for given that additional compaction. Furthermore, concrete in piles is compacted by power derived from free falling. Though, if vibrators are used, vibrated concrete can be compacted to sides of concrete casings and hinders lifting up of casings.
JOINTS IN MASONRY WORK
Define Cleaning for Underwater Inspection of Bridge? Before any structure can be inspected, it is necessary to expose the surface material of the structure. Wherever there is m
The thickness of a saturated specimen of clay under a consolidation pressure of 100 kN/m 2 of is 24 mm and its water content is 20%. On enhance of the consolidation pressure to 20
an increase in consumer income will affect the supply of any given product
Material for formwork and their specifications
Intercepting Drains: Intercepting drains, also known as catch-water drains, are provided in the uphill slope of hill roads to intercept the water and lead it to a natural wat
length of the line measured with 20m chain found to be 250m.calculate true length if the chain was 10cm long
Question While designing sewer pipes , why vitrified clay pipes commonly is used for pipe size less than 600mm still as precast concrete pipes with PVC lining is used for pipe
State the effect of shape on the bearing capacity. Differentiate among safe bearing capacity and allowable soil pressure. Write critical notes on (i) foundations on black cot
Maintenance of Drainage: Maintenance of drainage will ensure that the run-off is taken away from the runway efficiently. The side ditches and buried pipes should be cleaned r
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd