Concrete compaction in piling works, Civil Engineering

Assignment Help:

Question

What is the reason that vibrators not used in concrete compaction in piling works?


Answer

Concrete for piles must be a high-slump self-compacting mix that is capable of flowing between reinforcement cages with simplicity. As concrete is designed to be self-compacting, vibrators are not used for given that additional compaction. Furthermore, concrete in piles is compacted by power derived from free falling. Though, if vibrators are used, vibrated concrete can be compacted to sides of concrete casings and hinders lifting up of casings.

 


Related Discussions:- Concrete compaction in piling works

Ground water, Two pumping wells 1,000 m away fully penetrate the same confi...

Two pumping wells 1,000 m away fully penetrate the same confined aquifer. One of the wells pumps at a rate of 1,240 m3/day. The second well pumps at 850 m3/day. If the aquifer has

Explain coagulation - Surface Water, Explain Coagulation Surface wa...

Explain Coagulation Surface waters must be treated to remove turbidity, color and bacteria The traditional sand filtration is not sufficient in removing bacteria, viru

Bearings, what is the difference between whole circle bearing and reduced b...

what is the difference between whole circle bearing and reduced bearing?

M.o.c, lime saturation factor meaning with simple english

lime saturation factor meaning with simple english

What is froude number - hydrolic system, What is Froude Number? Used to...

What is Froude Number? Used to determine if the flow is rapid, critical or tranquil.  Fr = 1 critical flow; Fr 1 supercritical flow In rectangular open channels:  Fr =

#Paint, whats the mix ratio or proportion of paint components for 1litre

whats the mix ratio or proportion of paint components for 1litre

Pelton wheel, what is the use of the pelton wheel

what is the use of the pelton wheel

Determine the final volume of the compacted soil, 30,000-yd 3 of banked so...

30,000-yd 3 of banked soil from a borrow pit is stockpiled before being trucked to the jobsite.  The soil has 28% swell and shrinkage of 18%.  The final volume of the compacted so

Theory of structure, whatismeanby shear force and bending moment

whatismeanby shear force and bending moment

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd