These methods are also in vogue for estimating maximum discharge. Discharge estimated using the above three methods may be compared with design discharge based on the concept of return period and if the latter is significantly smaller, modification in design discharge figure may be made as considered necessary.

Where a formula has been established or graphs or charts prepared for discharge estimation based on actual hydrological and meteorological considerations, the values given by them may be adopted.

In case of new bridges, a temporary stream gauging station should be set up at or near the bridge site for as long a period prior to the design stage as practicable and gauge and discharge data collected. The highest flood level obtained in the past should be determined by local inquiries. A stage discharge curve should be drawn using the observed data and discharge corresponding to highest known flood level determined by extrapolation of the curve. Preparation and extrapolation of gauge discharge or stage-discharge curve has been dealt with in Chapter 10 on measurement of river water levels and discharge.

Where stage-discharge data cannot be obtained through field observations, a few points along the course of the river indicating the highest flood marks should be determined by local inquiries. The flood slope should be calculated from these marks and the discharge determined by Slope Area method.


Related Discussions:- Estimation of design flood discharge

Maximum shear stress - state of stress, Maximum shear stress - state of str...

Maximum shear stress - state of stress: Consider the state of stress. (a) According to principal stress theory the equivalent stress for this case is simply σ 1 , i.e. 300

Calculus, how can i get the centroids of the a given curve?. is there''s a ...

how can i get the centroids of the a given curve?. is there''s a formula for?

Calculate time taken for consolidation in actual layer, A clay layer 5 m th...

A clay layer 5 m thick has double drainage. It was consolidated under a load of 127.5 kN/m2. The load is enhanced to 197.5 kN/m 2 . The coefficient of volume compressibility is 5.7

Load transfer mechanism, Question What is load transfer mechanism for p...

Question What is load transfer mechanism for paving blocks in pedestrian footway? Answer In Hong Kong, footway is as a rule designed with paving slabs or interlocking b

Explain the equalization basins - hydraulic system, Equalization Basins - H...

Equalization Basins - Hydraulic System For influent flow to publicly owned treatment works (POTWs), flow rates may be excessive for short or long durations, especially in combi

BRIDGES, WHAT ARE THE DIFFERENT TYPES OF BRIDGES

WHAT ARE THE DIFFERENT TYPES OF BRIDGES

Determine the maximum pressure at the base of the wall, A masonry retaining...

A masonry retaining wall of trapezoidal section with the vertical face on the earth side is 1.5 m wide at the top and 3.5 m wide at the base and is 5.0 m high. It retains a sand fi

Calculate uniform annual cost for maintenance and repair, A contractor purc...

A contractor purchased a Caterpillar D-13 dozer for $100,000 and owned it for five years. The annual cost for maintenance and repair is provided in the Table. With annual interest

What are service reservoirs, Q. What are Service reservoirs? Service re...

Q. What are Service reservoirs? Service reservoirs, other than normal reservoirs are provided due to the subsequent reasons:  (i)  In case of breakdown of pumping stations a

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd