State different types of chlorination processes, Civil Engineering

Assignment Help:

Q. State different types of chlorination processes available in Railway & market for disinfect ion of water. What type of chlorine used in the above different process. What do you understand by Residual Chlorine and how it is measured?

(1) What are the different methods of chlorination available for disinfection of water?

Indicate the form of chlorine use in each of them.

(2) What do you mean by and how do you check ‘residual chlorine''?


Related Discussions:- State different types of chlorination processes

Main problems related with prestressed concrete piles, Question What ar...

Question What are main problems related with prestressed concrete piles ? Answer Origin of Daido piles comes from Japan where these prestressed actual piles are used

Mechanics problem, i am facing some problem in solving the problem of elong...

i am facing some problem in solving the problem of elongation due to self weight suspended from fixed support in the conical bar

Construct the shear force and bending moment diagrams, A Beam A B 12 meter ...

A Beam A B 12 meter long rests on supports 9 meter apart the right hand end over hanging the supports by 1 m and the left hand end by 2 m . The beam carries a uniformity distribute

How do we calculate absolute pressure, Absolute is equivalent to gauge pres...

Absolute is equivalent to gauge pressure plus atmospheric.

Define hydraulic grade line (hgl), Define Hydraulic Grade Line (HGL) Gr...

Define Hydraulic Grade Line (HGL) Graph of the sum of the pressure and potential energies at a position along a pipe or open channel. The difference between the EGL and the HGL

Air infiltration, Using Matlab/ Simulink software, verify the heating requi...

Using Matlab/ Simulink software, verify the heating requirement (kW) for the building because of  air infiltration and natural ventilation. Note that this needs you to estimate air

Bearing, difination of magnative bearing

difination of magnative bearing

How to design banks, Q. How to design banks? When approach banks are of...

Q. How to design banks? When approach banks are of medium height upto 3 m, the material may be homogeneous. For bigger heights zoned section with impervious core and pervious o

Determine the in-situ dry unit weight, Q. The following observations were r...

Q. The following observations were recorded in a Field density determination by sand-replacement method: Volume of Calibrating can = 1000 cm3 Weight of empty can = 10 N We

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd