Q. Inspection and Quality Control Certificate :
A 'lot' under inspection should be accepted by the inspector when no defect is found in the acceptance level tests and so certified. In case of any defect in the bearing, the whole 'lot' shall be rejected by the inspector and certified accordingly.
The bearings shall be transported to the bridge site after final acceptance and should be accompanied by an authenticated copy of the test certificate. An information card giving the following details should be appended to the test cerftificate:
1. Name of manufacturer
2. Date of manufacture
3. Grade of elastomer
4. Bearing dimensions
5. Production Batch No.
6. Accpetance lot No.
7. Date of testing
8. Specific bridge location
9. Explanation of markings on the bearing, if any.
Q. PH Value of Water? It is a symbol for hydrogen ion concentration and indicates acidity or alkalinity. When P H Value more than 7 water is alkaline and less than 7 water is a
If the standard deviation of an observation is ± 10-ft, the most probable error would be: The most probable error is defined as the error for which there are equal chances of t
Durability requirements for Concrete Even though the alkaline environment of concrete protects steel, carbonation of hydrated cement may decrease the effective protection. The
difference between BM and BC in black topping
i have to Design a gravity-flow sanitary sewer to serve and i need it to be done asap
Define Recommendations for PTFE? (a) It can be either of the two forms given below: (i) Dimpled large sheet It may be circular or rectangular divided maximum into four pa
zeolite process
what is arches ? what are the classification of arches
explain the steps to analyse a portal frame with sway condition
after formation of the soil under raft some area around the lift pit for example will be on tipping shape and some column placed in the same area the question how we place the col
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd