Q. Inspection and Quality Control Certificate :

A 'lot' under inspection should be accepted by the inspector when no defect is found in the acceptance level tests and so certified. In case of any defect in the bearing, the whole 'lot' shall be rejected by the inspector and certified accordingly.

The bearings shall be transported to the bridge site after final acceptance and should be accompanied by an authenticated copy of the test certificate. An information card giving the following details should be appended to the test cerftificate:

1. Name of manufacturer

2. Date of manufacture

3. Grade of elastomer

4. Bearing dimensions

5. Production Batch No.

6. Accpetance lot No.

7. Date of testing

8. Specific bridge location

9. Explanation of markings on the bearing, if any.


Related Discussions:- Inspection and quality control certificate

State the use of reinforced concrete, State the use of reinforced concrete ...

State the use of reinforced concrete The use of reinforced concrete may not solve all the problems. For example, a very long reinforced concrete member, which may be subjected

#title., what is the cause of scale and sludge formation and its diadvantag...

what is the cause of scale and sludge formation and its diadvantages

Shear Iosipescu Test, First Can I use this device to test concrete specimen...

First Can I use this device to test concrete specimen? I think the specimens sustain tensile strength with fixing the jaws! I want to know it is true or not?

Can you determine the quantity of apron stone, Q. Can you determine the Qua...

Q. Can you determine the Quantity of apron stone? Quantity should be sufficient to cover the scoured face down to maximum depth of scour obtained using scour factor c of 2.5 at

Determine the total active thrust by rebhann''s method, A retaining wall 3....

A retaining wall 3.6 m high supports a dry cohesion less backfill with a plane ground surface sloping upwards at a surcharge angle of 20° from the top of the wall. The back of the

Define rotation - actions in pot bearings, Define Rotation - Actions in POT...

Define Rotation - Actions in POT Bearings? POT bearings are associated with large rotations which are accommodated by the deformation of elastomeric pad. Large cyclic rotations

Explain the watersheds - hydrology, Explain the Watersheds - Hydrology ...

Explain the Watersheds - Hydrology The surface area on which runoff generated will flow to a common stream or body of water by gravity. Often separated by higher elevations/top

State the moulds in prestressed concrete, State the Moulds in Prestressed C...

State the Moulds in Prestressed Concrete Moulds for pre-tension work should be sufficiently strong and rigid so that they can withstand the effects of placing and compacting th

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd