Q. Inspection and Quality Control Certificate :

A 'lot' under inspection should be accepted by the inspector when no defect is found in the acceptance level tests and so certified. In case of any defect in the bearing, the whole 'lot' shall be rejected by the inspector and certified accordingly.

The bearings shall be transported to the bridge site after final acceptance and should be accompanied by an authenticated copy of the test certificate. An information card giving the following details should be appended to the test cerftificate:

1. Name of manufacturer

2. Date of manufacture

3. Grade of elastomer

4. Bearing dimensions

5. Production Batch No.

6. Accpetance lot No.

7. Date of testing

8. Specific bridge location

9. Explanation of markings on the bearing, if any.


Related Discussions:- Inspection and quality control certificate

Concrete cover to enhance fire resistance, Q. Concrete cover to enhance fir...

Q. Concrete cover to enhance fire resistance? In the event of exposing concrete structures to a fire, a temperature gradient is established across the cross section of concrete

Define equipments for inspection of steel/cast iron, Define Equipments and ...

Define Equipments and tools for Inspection of Steel/Cast Iron Substructures? To ensure thorough inspection, the area must be cleared of all marine growth. Hand tools such as wi

Surveying, define traverse.purpose of traverse, procedures of traverse, tak...

define traverse.purpose of traverse, procedures of traverse, taking linner measurment, types of traverse, convert the following quardnatal bearing to wcb. 1.OA= N15 deg10mins ''E,

Show the continuous piezocone penetration test, Q. Show the Continuous Piez...

Q. Show the Continuous Piezocone Penetration Test? Continuous piezocone penetration test essentiallycomprises standard cone penetration test and a measurement of pore water pre

Define the term - cracking load and proof stress, Define the term - Crackin...

Define the term - Cracking Load and Proof Stress Cracking Load The load on the structural member at the time of the initiation of first visible crack in concrete is know

Computer programming, compare 2 numbers and print either the message identi...

compare 2 numbers and print either the message identifying the greater than number(or) the message starting that both number are equal

Calculate the total duration for the four activity project, Calculate the T...

Calculate the Total Duration for the Four Activity Project Solution:      Scheduling work activity has associated time duration. The durations shown in the Table were e

The regulations and specification that followed for compacti, what are The ...

what are The regulations and specification that followed for compaction works for earth dam in Oman.

Moment, difference between moment and bending moment

difference between moment and bending moment

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd