Inspection and quality control certificate, Civil Engineering

Assignment Help:

Q. Inspection and Quality Control Certificate :

A 'lot' under inspection should be accepted by the inspector when no defect is found in the acceptance level tests and so certified. In case of any defect in the bearing, the whole 'lot' shall be rejected by the inspector and certified accordingly.

The bearings shall be transported to the bridge site after final acceptance and should be accompanied by an authenticated copy of the test certificate. An information card giving the following details should be appended to the test cerftificate:

1. Name of manufacturer

2. Date of manufacture

3. Grade of elastomer

4. Bearing dimensions

5. Production Batch No.

6. Accpetance lot No.

7. Date of testing

8. Specific bridge location

9. Explanation of markings on the bearing, if any.


Related Discussions:- Inspection and quality control certificate

Define the pre-tensioned concrete construction, Define the pre-tensioned co...

Define the pre-tensioned concrete construction We understand that in the pre-tensioned concrete construction, stretched tendons are provided in the concrete moulds at the time

Timber, TIMBER Timber refers to wood utilized for construction works. A...

TIMBER Timber refers to wood utilized for construction works. Actually the word timber is derived from an old English word 'Timbrian' that means 'to build'. A tree that yields

Key meaning of excellence of bentonite slurry, Question What is key me...

Question What is key meaning of excellence of bentonite slurry in construction of diaphragm walls? Answer Quality of slurry plays a significant role in quality of di

Design of masonry, Describe the different types of Ant proof courses

Describe the different types of Ant proof courses

Determine the reliable moment capacity, Figure 2 details a typical T-beam u...

Figure 2 details a typical T-beam unit in a beam and slab floor with a span of L = 10 m. Determine the reliable moment capacity M ′ for the T-section shown. Take f c ′ = 32

Transportation engineering, what is difference between stopping sight dista...

what is difference between stopping sight distance and overtaking sight distance

Local scour at obstructions in rivers, Q. Local Scour at obstructions in ri...

Q. Local Scour at obstructions in rivers? When the water flow in river is deflected by obstructions such as bridge piers, scouring would occur arising from formation of vortexe

What is venturimeter, Q. What is Venturimeter? The Venturimeter is an a...

Q. What is Venturimeter? The Venturimeter is an apparatus for finding out the discharge of a liquid flowing in a pipe . A Venturimeter in its simplest from consist of the follo

Determine the statement about construction earthwork, Which of the followin...

Which of the following statements about construction earthwork are true: I.  The volume of earth known in its natural state is known as bank-measure; in-situ; in-place; virgin

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd