Q. Inspection and Quality Control Certificate :
A 'lot' under inspection should be accepted by the inspector when no defect is found in the acceptance level tests and so certified. In case of any defect in the bearing, the whole 'lot' shall be rejected by the inspector and certified accordingly.
The bearings shall be transported to the bridge site after final acceptance and should be accompanied by an authenticated copy of the test certificate. An information card giving the following details should be appended to the test cerftificate:
1. Name of manufacturer
2. Date of manufacture
3. Grade of elastomer
4. Bearing dimensions
5. Production Batch No.
6. Accpetance lot No.
7. Date of testing
8. Specific bridge location
9. Explanation of markings on the bearing, if any.
Q. Show the process of Waterproofing for bridge decks? Waterproofing materials such as membranes are applied on top of bridge deck surface since: (i) Vehicular traffic (f
contituents of paints
Q. What do you mean by Geotextile filter? Geosynthetics is a collective term applied to thin, flexible sheets incorporated in or about soil to enhance its engineering performan
explain tie lines?
Determine the term - lowering of stresses Due to creep of concrete, these compressive strains keep on increasing with time. it means that the length of the member keeps on red
First Can I use this device to test concrete specimen? I think the specimens sustain tensile strength with fixing the jaws! I want to know it is true or not?
Define Contaminants - underwater inspection of bridge? There are various substances that may be inadvertently incorporated into the concrete matrix (e.g. glass, coal, gypsum),
An oven-dried soil weighing 1.89 N is placed in a pyknometer which is then filled with water. The total weight of the pyknometer with water and soil is 15.81 N. The pyknometer fill
Maximum thermal stress in circular tapering section is
explain it.....
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd