A 'lot' under inspection should be accepted by the inspector when no defect is found in the acceptance level tests and so certified. In case of any defect in the bearing, the whole 'lot' shall be rejected by the inspector and certified accordingly.
The bearings shall be transported to the bridge site after final acceptance and should be accompanied by an authenticated copy of the test certificate. An information card giving the following details should be appended to the test cerftificate:
1. Name of manufacturer
2. Date of manufacture
3. Grade of elastomer
4. Bearing dimensions
5. Production Batch No.
6. Accpetance lot No.
7. Date of testing
8. Specific bridge location
9. Explanation of markings on the bearing, if any.
reinforcement.
distomat
Ask queexplain about the essential parts of transisit ordinate or vernier theodolitestion #Minimum 100 words accepted#
A flitched beam consists of a wooden joist 150 mm wide and 300 mm deep strengthened by steel plates 12 mm thick and 300 mm deep one on either side of the joist. If the maximum st
State about the pre-tensioned concrete In pre-tensioned concrete, the tendon stresses are transferred to concrete by virtue of bond of concrete to the surface of steel tend
Calculate the Actual Water Cement Ratio A jobsite delivery ticket is shown below for a grout mix. The actual w/c ratio is most nearly: Solution: Note, althou
#how the result of DETERMINATION OF THE 10 PERCENT FINES value can be interprited?
Maintenance of Concrete Roads: The main defects that show up in a concrete road are : (a) cracks (b) loss of sealant (c) spalling at joints (d) loss of texture
The survey has identified the beginning and ending points along an urban arterial highway that require new sidewalks. The first station is located at 5+88 and the second station is
A retaining wall with a vertical back 5 m high supports cohesion less backfill of unit weight of 19 kN/m 3 . The upper surface of the backfill rises at an angle of 10° with the hor
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd