What is standard penetration test, Civil Engineering

Assignment Help:

a) Describe the recommended construction practices to avoid deterimental differential settlement in large structures.

(b) What is meant by bearing capacity of soil? How will verify determine it in the field? Explain the procedure bringing out its limitations.

(c) Write brief critical notes on:

(i) Standard Penetration test

(ii) General shear failure and local shear failure of shallow foundations.

 


Related Discussions:- What is standard penetration test

Determine the northing and easting coordinates, The northing and easting co...

The northing and easting coordinates for point C is most nearly:    Solution: Section the triangle and calculate using Pythagorean Theorem and the Law of Sine's or us

Explain the signalized intersections - transportation, Explain the Signaliz...

Explain the Signalized Intersections Cycle length - the time required for one complete sequence of all signal indications Phase - the right-of-way (green), change (yellow),

Explain critical factor in design of shock transmission unit, Explain Criti...

Explain Critical factor in Design of shock transmission unit? (a) STUs are unidirectional devices for load transmission. If out of plane forces will be acting on the STU, the a

Mechanics of solid, determine the end slope and deflection in the beam

determine the end slope and deflection in the beam

Position of shear keys under retaining walls, Installation of shears keys a...

Installation of shears keys assists to increase sliding resistance of retaining walls without the necessity to widen the base. Effect of shears keys enhances the deepening of the s

Advantages of using top-down approach, Question What are major advantag...

Question What are major advantages of using top-down approach in basement construction? Answer The main advantages of top-down approach are listed below- (i) Stru

Increasing concrete cover beyond contractual, Question If contractor sugges...

Question If contractor suggests increasing concrete cover beyond contractual such as 40mm to 70mm shall engineers accept suggestion? Answer In contractual part, based on requir

Flow diagram of wet process, what type of basin in which is stored and wha...

what type of basin in which is stored and what is silos what is channel and correcting basins what type of clinker is formed

Calculate the total cost for the project, The total equipment cost for an a...

The total equipment cost for an addition to a pharmaceutical plant is estimated to be $5,000,000. The percentages provided in the Table represent the average expenditures in other

Evaluate the length of guide bund, Q. Evaluate the Length of guide bund? ...

Q. Evaluate the Length of guide bund? For encouraging axial flow through the bridge, upstream length of guide bund may be kept 1.0 to 1.5 times the bridge length and downstream

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd