Explain the term - moderate prestressing, Civil Engineering

Assignment Help:

Explain the term - Moderate Prestressing

In this form of prestressing, no limit is imposed on  the magnitude of tensile stresses which may be produced in a concrete member under working loads. In fact, this is not prestressed concrete in  the real practical sense as its behaviour is more similar to that of reinforced concrete. It is recommended that structural members falling in this type should be analyzed according to the rules and concepts, applicable to reinforced concrete structural members.

 


Related Discussions:- Explain the term - moderate prestressing

Sir I want to do assignments, sir I want to do assignments which were provi...

sir I want to do assignments which were provided by you sir could you please check with that

Define structural damage - underwater inspection of bridge, Define Structur...

Define Structural Damage - underwater inspection of bridge? Structural damage to the substructure below waterline can be classified as under: i. Construction damage or error

Explain chlorine residuals, Explain Chlorine Residuals Free Chlorine Re...

Explain Chlorine Residuals Free Chlorine Residuals: Cl 2 , HOCl, OCl-   Combined Chlorine Residuals: Chloramines (mono, di and tri chloramines) The disinfecting ability o

Determine the limit states of serviceability, Limit States of Serviceabilit...

Limit States of Serviceability These are those limit states which point out to the inability of a structure or a structural component in functioning properly as per the intende

Horizontal curves - geometric design of roads, Horizontal Curves: Whe...

Horizontal Curves: When a vehicle of mass m moves on a curve of radius R with a speed of v (m/sec) (as shown in Figure 1) it is subjected to a centrifugal force equal to:

coursework (commercial management), Ask que1. Identify the risks involved ...

Ask que1. Identify the risks involved in this project related to cost in the perspective of the customer and analyse the probability of acceptance of such a project by customers. 2

Determine the co-ordinates of grain-size distribution curve, In a hydromete...

In a hydrometer analysis, 0.5 N of soil was mixed in water to form one litre of uniform suspen- sion. The corrected hydrometer reading after a lapse of 60 min. from the start of se

Graduate, fabrication methods of ironmongery

fabrication methods of ironmongery

Fixed and pinned connection between piles and pile caps, Q. Fixed vs pinned...

Q. Fixed vs pinned connection between piles and pile caps? The type of connection amid piles and pile caps affects the load carrying capacity of pile groups. Fixity of pile hea

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd