Explain the term - moderate prestressing, Civil Engineering

Assignment Help:

Explain the term - Moderate Prestressing

In this form of prestressing, no limit is imposed on  the magnitude of tensile stresses which may be produced in a concrete member under working loads. In fact, this is not prestressed concrete in  the real practical sense as its behaviour is more similar to that of reinforced concrete. It is recommended that structural members falling in this type should be analyzed according to the rules and concepts, applicable to reinforced concrete structural members.

 


Related Discussions:- Explain the term - moderate prestressing

Why nautical mile is different from statute mile, One nautical mile is desc...

One nautical mile is described by one latitude minute of arc (there are 60 like minutes to a degree). This equals 1852 meters, and roughly (but coincidentally) 2000 yards or 6000 f

Aashto method, Question 1: A stationary 40 kN single axle load (applied on...

Question 1: A stationary 40 kN single axle load (applied on a circular contact area of radius = 152 mm = 6") is applied to each of the flexible pavement structures indicated below

Define the types of pump performance curves, Define the types of Pump Perfo...

Define the types of Pump Performance Curves Two types of pump performance curves: x-axis = flow rate; y-axis = head (TDH). Characteristic curves: Provided by the pump m

What is the meaning of concordant prestressing, Concordant Prestressing ...

Concordant Prestressing In this type of prestressing, tendons follow a concordant profile. The concordant profile of  tendons does not change the support reactions in a statica

Manufacturing of cement, describe with neat sketch the process of manufactu...

describe with neat sketch the process of manufacturing of cement in the modern factory by dry process

Calculate the most probable value, The most probable value of the following...

The most probable value of the following observations on the same angle (35º 17' 42" ; 35º 17' 38" ; 35º 18' 00" ; 35º 17'; 22"; 35º 17' 42");  is most nearly:   35º 17' 40.8

Explain the well drawdown equations - ground water, Explain the Well Drawdo...

Explain the Well Drawdown Equations Watch the units, especially if you use log 10 or ln.    h 1 = aquifer thickness minus the drawdown (ft)  r 1 = distance from well (ft

Define design aspects of pot bearing, Define Design Aspects of Pot Bearing?...

Define Design Aspects of Pot Bearing? Basic elements of a POT bearing are: - POT or a shallow cylinder - An elastomeric pad - A set of sealing rings - A piston P

Treatment plant - sewer construction, Treatment plant - sewer construction:...

Treatment plant - sewer construction: Problem: How many kg of primary and secondary dry solids needs to be processed daily from the treatment plant? Solution An a

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd