Q. Bleeding test for grout – an essential requirement?
Bleeding is a form of segregation in that a layer of water migrates to surface of the grout at the time of the initial stage of cement hydration process. Afterward some of the floating water is re-absorbed into the grout because of further hydration reactions. Even without problem of bleeding, there is a total reduction of volume of grout after hydration action when compared with total initial individual volume of cement and reacted water. Bleeding tests must be carried out for grout due to the below reasons:
(i) At the time of bleeding, up flow of water from grout mixture leads to formation of channel paths inside the grout mix. These channels behave as potential paths for aggressive materials to pass through as these channels will not be closed during further hydration of the grout.
(ii) Loss in volume by bleeding generates voids inside the grout mix that affects the properties and performance of the grout. Furthermore it increases the chance of corrosion of steel elements protected by the grout. (Such as tendons)
(iii)In bleeding test, there is a typical requirement of total re-absorption of water after 24 hours of grout mixing since for some cold countries, this layer of water can cause severe freezing problem leading to frost damage.
Discuss about the fibre reinforced concrete Tensile strength of concrete may be improved by using a higher grade of concrete or by using special concretes such as fibre reinfor
#questionlist of buiding team members ..
how is total station used?
Extreme fiber stresses at the mid span section of the beam A pre-stressed concrete beam, of cross section 300 mm x 500 mm and 8 m span, is pre-stressed with a parabolic tend
detail notes
Determine the hydraulic radius R for a rectangular open channel with dimensions of 6 ft wide and 4 ft high (side walls) flowing at a depth of 3 ft. Solution: R = A/P Cross-s
Q. Purpose of setting minimum amount of longitudinal steel areas for columns? In some design codes it specifies that area of longitudinal steel reinforcement must be not less
How to prepare rapid sand filter autocad drawing
Micro-organism ratio: Determine the F/M ratio (in units of lbs BOD5/lb MLSS-day) using data provided in the above example problem. Solution By definition, F/M = Q S
Q. Purpose of using capping layers in pavement construction? When California Bearing Ratio of subgrade is checked to be below a specific percentage (for example 5%), a capping
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd