Importance of tendons in post-tensioned members, Civil Engineering

Assignment Help:

Importance of Tendons in post-tensioned members

Tendons in post-tensioned members are subjected to different amounts of stresses (among themselves) due to following reasons.

The initial lengths of all tendons are not exactly equal.

In a duct, same curvature may not be provided to all tendons compared to an average wire.

There may be some variation in the modulus of elasticity of steel tendons. So, even when they are stretched by same amount, there may be some differences in tendon stresses.

Some wires may be subjected to slip of anchorage and stresses in them may be lower.

 


Related Discussions:- Importance of tendons in post-tensioned members

What is standard penetration test, a) Describe the recommended construction...

a) Describe the recommended construction practices to avoid deterimental differential settlement in large structures. (b) What is meant by bearing capacity of soil? How will ver

Survying, what aare the parts and function of steel tape ?

what aare the parts and function of steel tape ?

Slope IN Civil, How to calculate the slope in civil engineering?????

How to calculate the slope in civil engineering?????

Define the degree of saturation and soil moisture content, Establish the r...

Establish the relationship among degree of saturation, soil moisture content, definite gravity of soil particles, and void ratio. The volume of an undisturbed clay sample having

Calculate the modulus of elasticity of concrete, Calculate the Modulus of e...

Calculate the Modulus of elasticity of concrete A pre-stressed concrete beam, having a cross-section of 150 mm width and 400 mm depth, is used over a span of 8 m. Straight tend

Properties of ordinary portland cement, Properties of Ordinary Portland Cem...

Properties of Ordinary Portland Cement (i) Chemical properties: Portland cement consists chemical compounds are following: (a) Tricalcium silicate          3 CaO.SiO 2 (C

Determine the amount of excavated material, The footprint of a proposed off...

The footprint of a proposed office building is overlaid on the existing contours topographic map of a sloping site as shown in the figure. The structural bays which are 65-ft by 65

Design the water supply system a high service tank, Q. There is a railway c...

Q. There is a railway colony of 500 house holds source of water is from a tube well 800 m away. The colony is 10 m higher then the ground at source. Tube well is 60 meters deep. De

#overhanging beams, How to calculate point of contraflexion on an overhangi...

How to calculate point of contraflexion on an overhanging beam with udl

Estimation specification and costing, Estimate the single room of size 3m x...

Estimate the single room of size 3m x 4m x height 3m using individual wall method?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd