Explain flash butt welding, Civil Engineering

Assignment Help:

Q. Explain Flash Butt welding?

In this process the ends of two rails are kept at fixed distance apart and a mould (designed to suit the rail section ) is fitted on. The rail ends are then heated to yellow red temperature with a blowlamp. A swiveling type crucible containing iron oxide and aluminum powder to match the metallurgical composition of the rails is then ignited and the molten metal is poured into the mould so that the gap between the rail ends is filled up with over flow on all sides. The mould is then removed and excess metal is chipped off from the railhead while still hot. Later it is filed to railhead profile.

Normally it takes 45 minutes to weld a joint but by quick thermit process it can be done in 15 minutes. The joint can be brought into use immediately after welding.


Related Discussions:- Explain flash butt welding

Wet mix macadam - road pavements, Wet Mix Macadam: For heavily traffi...

Wet Mix Macadam: For heavily trafficked highways, the granular bases are constructed using Wet Mix Macadam (WMM). The WMM is a specification in which well graded aggregate is

State the procedure of prestressing, State the procedure of prestressing ...

State the procedure of prestressing When these wires cool down, concrete is poured in the moulds in which these tendons are provided in a stretched condition. Using this proces

What do you mean by distressing, Q. What do you mean by Distressing? Di...

Q. What do you mean by Distressing? Distressing is the operation under taken with or with out rail tensors to secure stress free condition in the LWR at a desired rail temperat

CONCRETE BATCHING, DOES A GAUGE BOX OF THE SIZE LIKE 50,40,30 MM EXISTS?

DOES A GAUGE BOX OF THE SIZE LIKE 50,40,30 MM EXISTS?

Analysis of prestress and bending stresses, Normal 0 false fa...

Normal 0 false false false EN-IN X-NONE X-NONE

Compacted thickness of bituminous pavement, Q. Compacted thickness of bitum...

Q. Compacted thickness of bituminous pavement? The choice of compacted thickness is closely related to the nominal maximum size of aggregates of bituminous materials. Based on

Moisture content, What is moisture content for road work

What is moisture content for road work

Pre-stressing work, Under which situation shall engineers use jacking in ag...

Under which situation shall engineers use jacking in agreement end only and from both ends in pre-stressing work?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd