Explain flash butt welding, Civil Engineering

Assignment Help:

Q. Explain Flash Butt welding?

In this process the ends of two rails are kept at fixed distance apart and a mould (designed to suit the rail section ) is fitted on. The rail ends are then heated to yellow red temperature with a blowlamp. A swiveling type crucible containing iron oxide and aluminum powder to match the metallurgical composition of the rails is then ignited and the molten metal is poured into the mould so that the gap between the rail ends is filled up with over flow on all sides. The mould is then removed and excess metal is chipped off from the railhead while still hot. Later it is filed to railhead profile.

Normally it takes 45 minutes to weld a joint but by quick thermit process it can be done in 15 minutes. The joint can be brought into use immediately after welding.


Related Discussions:- Explain flash butt welding

What are rules for working of dip lorries, Q. What are rules for working of...

Q. What are rules for working of Dip lorries and their protection arrangements on a single line section explain with sketches? Ans.-Rules for working of Dip lorries - i. Sub

STRENTH OF MATERIAL, WHY WE ARE USING MAMENT OF INERTIA IN STRAIN ENERGY ST...

WHY WE ARE USING MAMENT OF INERTIA IN STRAIN ENERGY STRUCTURE

Define the hazard ranking system (hrs), Define the Hazard Ranking system (H...

Define the Hazard Ranking system (HRS) - A procedure for ranking uncontrolled hazardous waste sites in terms of the potential threat based upon the containment of the route of

Retaioning walls, what are the uses of retaining wall?!

what are the uses of retaining wall?!

Load transmission, • The transmission of load through a structure can be co...

• The transmission of load through a structure can be complex but in any particular case            - The applied load can usually be classified into 4 types                •

Precast pile, when a precast pile is single point lifting and when double p...

when a precast pile is single point lifting and when double point lifting- what are the moment coefficient of them?

Surveying, shrinkage factor in plans

shrinkage factor in plans

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd