Q. Explain Flash Butt welding?

In this process the ends of two rails are kept at fixed distance apart and a mould (designed to suit the rail section ) is fitted on. The rail ends are then heated to yellow red temperature with a blowlamp. A swiveling type crucible containing iron oxide and aluminum powder to match the metallurgical composition of the rails is then ignited and the molten metal is poured into the mould so that the gap between the rail ends is filled up with over flow on all sides. The mould is then removed and excess metal is chipped off from the railhead while still hot. Later it is filed to railhead profile.

Normally it takes 45 minutes to weld a joint but by quick thermit process it can be done in 15 minutes. The joint can be brought into use immediately after welding.


Related Discussions:- Explain flash butt welding

Define lead lag relationships - construction management, Define Lead Lag Re...

Define Lead Lag Relationships 1. A lead is when the successor task begins before the predecessor task is complete 2. A lag is when a successor task does not

Define drag load test of shock transmission unit, Define Drag load test of ...

Define Drag load test of shock transmission unit? This test ensures that excessive load should not be transmitted to the structure by the STU. As per the test the STU shall hav

State average increase of pressure in the clay stratum, A building was to b...

A building was to be constructed on a clay stratum. Preliminary analysis showed a settlement of 60 mm in 6 years and an ultimate settlement of 250 mm. The average enhance of pressu

Conventional incineration and refuse-derived fuel facilities, Explain the C...

Explain the Conventional Incineration and Refuse-Derived Fuel Facilities? 1. Conventional (Mass-Fired) Incineration most common form of municipal solid waste (MSW) incin

Explain the frame member''s effective lengths, Explain the Frame member's e...

Explain the Frame member's effective lengths 1. Effective length is a product of an effective length factor (k) and the actual length of the column. 2. k depends on th

What are the long spam bridge girders, What are the long spam bridge girder...

What are the long spam bridge girders The pre-tensioned construction finds more use and application in the construction of those structural concrete members which are of small

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd