State the volume change from the plastic limit, Civil Engineering

Assignment Help:

The plastic limit and liquid limit of a soil are 33% and 45% respectively. The percentage volume change from the liquid limit to the dry state is 36% of the dry volume. Likewise, the percentage volume change from the plastic limit to the dry state is 24% of the dry volume. Verify the shrinkage limit and shrinkage ratio.

 


Related Discussions:- State the volume change from the plastic limit

., WHAT IS PILE CORROSION

WHAT IS PILE CORROSION

Plastic, what is plastic?its types and composition and its uses as engineer...

what is plastic?its types and composition and its uses as engineering material

Quantity calculation for subgrade preparation, reparation of subgrade in sq...

reparation of subgrade in sqm for a road of span 12 km and width 5.25m,with shoulders of 0.75m span on both the sides...considering extrawidening too......plz help...i m preparing

Structure analysis, In a cantilever truss it is very essential to find out ...

In a cantilever truss it is very essential to find out the reactions before analyzing it.

Window, sliding window lowered window sash or glazed window circular window...

sliding window lowered window sash or glazed window circular window

Key mechanism of defence by hot dip galvanizing, Question What is key m...

Question What is key mechanism of defence by hot dip galvanizing ? Answer Hot dip galvanizing protects steel or iron from corrosion by- (i) It figures a metallic z

Difference between soft wood and hard wood, The classification as soft wood...

The classification as soft wood and hard wood has commercial significance. The difference between soft wood and hard wood is described below: The color of soft wood is light

Show the process of waterproofing for bridge decks, Q. Show the process of ...

Q. Show the process of Waterproofing for bridge decks? Waterproofing materials such as membranes are applied on top of bridge deck surface since:  (i)  Vehicular traffic (f

Write a short note on economic span of a bridge, Q. Write a short note on E...

Q. Write a short note on Economic Span of a Bridge? The span for which the total cost of bridge will be minimum is known as the economic span. The ratio of Cost of super str

Doors and windows, what are the actuall windows and door dimensions e.g AN ...

what are the actuall windows and door dimensions e.g AN ND4

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd