State the volume change from the plastic limit, Civil Engineering

Assignment Help:

The plastic limit and liquid limit of a soil are 33% and 45% respectively. The percentage volume change from the liquid limit to the dry state is 36% of the dry volume. Likewise, the percentage volume change from the plastic limit to the dry state is 24% of the dry volume. Verify the shrinkage limit and shrinkage ratio.

 


Related Discussions:- State the volume change from the plastic limit

What is the loss of prestress due to shrinkage of concrete, What is the Los...

What is the Loss of Prestress due to Shrinkage of Concrete It is the loss of prestress due to shrinkage of concrete, which takes place in the initial stage of hardening of conc

Indicate quality of rock foundation, Question During piling works, norm...

Question During piling works, normally founding levels of bored piles are definite by using total core recovery or rock quality designation (RQD). Are there any problems by

Types of limes and their properties, Types of Limes and their Properties ...

Types of Limes and their Properties The limes are classified in three categories as fat lime, hydraulic lime and poor lime: (1) Fat lime: It is composed of 95 percentage o

Diagram of distribution pipelines from an overhead tank, Q. There is a colo...

Q. There is a colony having 15 blocks of Type - II quarters, each block having 8 quarters. Make out a diagram of distribution pipelines from an overhead tank and up to the quarters

Determine the loss of fluid energy, Determine the loss of fluid energy as 3...

Determine the loss of fluid energy as 310 gallons per minute (gpm) of water flows through 1,000 ft of 4 inch, schedule-40 welded and seamless steel pipe. The fluid temperature is 5

Survey, 3-d figure of line ranger

3-d figure of line ranger

#Friction, #Determine the smallest value of P and corresponding angle to th...

#Determine the smallest value of P and corresponding angle to the inclined plane which is inclined by 30 degree to horizontal to just start the block moving up the inclined plane.

Various operations involved in maintenance by beater packing, Q. Explain in...

Q. Explain in details the various operations involved in Through Packing - conventional Maintenance by beater packing. Explain the various operations as per the Permanent Way

IRC Class AA loading in existing industrial areas, For IRC Class AA loading...

For IRC Class AA loading in existing industrial areas, what is load (kN/m) has to applied base don the wheel loads. especially raft foundation & roads are at same level.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd