Determine the ground elevation, Civil Engineering

Assignment Help:

The trigonometric levelling from the surveyor's notes is shown below. The ground elevation of T (ft) is most nearly:

Solution:  The elevation of point P can be found from:

ElevP = elevT + HI - (Horizontal Distance) tan α + Rod Reading

ElevT = elevP - HI + HD tan α + RR

           = 1703.99-ft - 5.02-ft + (220.85) tan 7°10'10" + 4.22-ft

           = 1730.97-ft (answer)


Related Discussions:- Determine the ground elevation

Water tretement, define scale and sludge and mention the scale and sludge f...

define scale and sludge and mention the scale and sludge forming substance and explain the prevention methods

Functions of a column in a building, What are the functions of a column in ...

What are the functions of a column in a building? Ans) A column is used to handle the weight of the roof and/or the upper floors. Now days, many columns are used for decorative

What are aquifers - hydraulics system, What are Aquifers? Water bearing...

What are Aquifers? Water bearing, underground geologic formations. The subsurface formations are composed of soils and rocks with voids saturated with water.

Define the disintegration - underwater inspection of bridge, Define the Dis...

Define the Disintegration - underwater inspection of bridge? Disintegration of concrete may be defined as the deterioration of concrete into small fragments or particles result

Define hammer efficiency and coefficient of restitution, Q. Define Hammer e...

Q. Define Hammer efficiency and coefficient of restitution? Hammer efficiency refers to ratio of kinetic energy of hammer to the rated energy (or potential energy). Basically i

Cumulative error, diffrence between cumilative compensative error

diffrence between cumilative compensative error

Builiding, how to bulid a bilding?

how to bulid a bilding?

Total volume of soil that excavated from the borrow area, Project specifica...

Project specifications require a relative compaction of 95% (modified Proctor).  Construction of a highway embankment requires 10,000-yd 3 of fill.  The borrow soil has an in-situ

Moment redistribution, how to draw the shear diagram after redistribution o...

how to draw the shear diagram after redistribution of moments

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd