Why IRC 37-2012 has taken 90th percentile for pavement design of expressway or NH while they hav taken 80th percentile for state highway design ????????

Related Discussions:- CBR of soil

Define factor that is not concerned with schedule control, Schedule control...

Schedule control is concerned with all of the following except: a. Influencing the factors which create schedule changes b. Determining that the schedule has changed c.

Calculate the deposited amount - construction management, An engineer depos...

An engineer deposits an "X" amount every 6 months for 3 years so that she'll have $10,000 at the end of this period. The interest rate is 5% per year which is rebalanced every 6-mo

Zones of smear around vertical drains, Zones of smear around vertical drain...

Zones of smear around vertical drains Smear zones are produced during the installation of vertical drains in that zone of soils surrounding the band drains are disturbed. Soil

Seasoning of timber, Seasoning of Timber It is a process by which moist...

Seasoning of Timber It is a process by which moisture content in a freshly cut tree is reduced to a appropriate level. The durability of timber is increased by doing so. The se

Example of bars of varying cross section, Example of Bars of Varying Cross ...

Example of Bars of Varying Cross Section: In the numerical example under consideration δ = 750 × 300/( π/4) × 200 2 × 60 +750 × 400/(π/4) × 135 2 × 60 + 750 × 200/(π/4)

Verify the intensity of vertical stress at a point, Verify the intensity of...

Verify the intensity of vertical stress at a point A line load of 100 kN/metre run extends to a long distance. Verify the intensity of vertical stress at a point, 2 m below the

WMM, what is wmm what are all the uses of that wmm

what is wmm what are all the uses of that wmm

Physical classification of stones, Physical Classification Based on the...

Physical Classification Based on the structure, the rocks can be classified as following: Stratified rocks Un -stratified rocks A.   Stratified Rocks: These ro

Cross Section Method, Cut and Fill Calculation Using Cross Section Method

Cut and Fill Calculation Using Cross Section Method

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd