Compute the porosity of the initial soil sample, Civil Engineering

Assignment Help:

A completely saturated sample of clay has a volume of 31.25 cm3 and a weight of 0.5866 N. The same sample after drying has a volume of 23.92 cm3 and a weight of 0.4281 N. Compute the porosity of the initial soil sample, specific gravity of the soil grains and shrinkage limit of the sample.


Related Discussions:- Compute the porosity of the initial soil sample

Explain procedure of remote sensing in satellites, Q. Explain procedure of ...

Q. Explain procedure of remote sensing in Satellites? Satellites used for remote sensing are of two types, viz, geostationary and polar orbiting. Geostationary stationary satel

What is meaning of maintenance period, Question If contractor is likely...

Question If contractor is likely for defective works for 12 years with pact under seal, then what is meaning of Maintenance Period? Answer Faulty works constitute a br

Determine the equivalent of free float, The free float is equal to: a. L...

The free float is equal to: a. Latest allowable event occurrence time + Early finish time b. Earliest event occurrence time + early finish time c. Latest allowable event o

Analysis of the two stage construction, A County is planning to build a new...

A County is planning to build a new roadway connector in the rapidly developing area of the county. The road can be built at a reduced capacity now for $30 million and can be widen

Discontinuity of joint – position of bearing, Q. Discontinuity of joint – p...

Q. Discontinuity of joint – position of bearing? Expansion joints in a bridge structures cater for movements inlongitudinal, transverse, vertical and rotational forms. Layout a

Define the finish-to-start dependency, Sheet rock cannot be installed in th...

Sheet rock cannot be installed in the new house you are building until a building inspector approves the plumbing, electrical, HVAC, and insulation.  This is an example of:

Determine the concept of resultant force at a section, Resultant force at a...

Resultant force at a section We can determine stresses at top and bottom fibres, at a section of a beam, due to pre-stressing force and external loads. Using them, we can draw

CBR of soil, Why IRC 37-2012 has taken 90th percentile for pavement design ...

Why IRC 37-2012 has taken 90th percentile for pavement design of expressway or NH while they hav taken 80th percentile for state highway design ????????

Write Your Message!

Captcha
Free Assignment Quote