Q. What do you understand by Percolation of water?
Percolation of water into the ground or embankment takes place, causing rise in water table and / or saturation of the body. The percolation results in seepage force in the form of pore water pressure. Thee seepage may result in to in piping through the body of an embankment in the long run. If measures are not taken to drain the water safely out of the body, failure of bank or embankment slopes during floods can take place very quickly. In the preliminary stage, signs of such failure can be seen as slips, sink holes, boils, settlement, etc.
Figure 2 details a typical T-beam unit in a beam and slab floor with a span of L = 10 m. Determine the reliable moment capacity M ′ for the T-section shown. Take f c ′ = 32
Schedule control is concerned with all of the following except: a. Influencing the factors which create schedule changes b. Determining that the schedule has changed c.
Q. Reasons for blockage in pumping concrete ? Concrete pumping is normally adopted in highly elevated locations for which access for concrete trucks is difficult. Construction
Define the Ignitability - Hazardous Waste - is a liquid with flash point - Not a liquid and capable of spontaneous and sustained combustion under normal conditions - Ign
what is the water bound macadam road
discuss various chemical reactions involved in lime soda process ?
Maintenance of Water Bound Macadam Roads: The maintenance of water bound macadam surface consists of : filling potholes, ruts with additional material and adequately c
have a beam with one lateral restraint at bottom and top flange and load on top flange, should I use 2 segments or one segment of the beam ignoring bottom restraint as it is not in
Define Divers in a team for Underwater inspection of Bridge? One team of divers should have minimum three members. This is a requirement of safe working. The idea is while a mi
Economic span
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd