Question
Spacing of manholes in straight sections for diverse pipe sizes is stated in Storm water Drainage Manual. How are figures arrived on?
Answer
For pipe size is less than 300mm, rodding is typically adopted in which workers place about 1m long rods during pipes to location of blockage and physically operate the rod to clear blockage. For pipe size is less than 700mm, water-jetting is generally working in which water is supplied from nearby fire hydrants and pressurized water jet is used for clearing obstacle.Winching scheme is adopted for every size of pipes.
For example, for pipe size more than 1050mm, it is stated in Storm water Drainage Manual that utmost intervals between manholes length of straight lengths should be 120m. This is as for sizes over 1050m; main method of pipe maintenance is by winching whose utmost length of operation is 120m. Likewise, highest intervals of manholes for other directly pipes are derived from their corresponding protection processes.
If the resultant forces are resolved in the three co-ordinate directions and divided by the area of the face of the cube we have the general state of 3-dimensional stress as shown.
Describe the different types of Ant proof courses
modified pratt truss with detailing in 3D
With a clear sketch indicate the system of protection of line for works of short duration where ‘ Stop dead restriction' need to be observed on a single line section on a BG track.
Explain the Primary Treatment for Wastewater Primary Treatment: to remove the pollutants that floats or settles. Typically 60% of suspended solids and 35% of BOD 5 are removed
Question Why are transitional jacks designed in pipe jacking projects? Answer While development of pipe jacking stops, building up of confrontation is extremely
explain the steps to analyse a portal frame with sway condition
Determine about the post-tensioned concrete The transfer stage may take place after a long time from the casting of concrete, in the case of post-tensioned,members, enabling th
battened system with end tie plate
Shape and Soundness Test - Testing of aggregates: Shape For providing a good interlock and strength, the aggregates should be cubical in shape. Elongated and flaky pa
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!