Spacing of manholes in straight sections, Civil Engineering

Assignment Help:

Question

Spacing of manholes in straight sections for diverse pipe sizes is stated in Storm water Drainage Manual. How are figures arrived on?

Answer

For pipe size is less than 300mm, rodding is typically adopted in which workers place about 1m long rods during pipes to location of blockage and physically operate the rod to clear blockage.

For pipe size is less than 700mm, water-jetting is generally working in which water is supplied from nearby fire hydrants and pressurized water jet is used for clearing obstacle.Winching scheme is adopted for every size of pipes.

For example, for pipe size more than 1050mm, it is stated in Storm water Drainage Manual that utmost intervals between manholes length of straight lengths should be 120m. This is as for sizes over 1050m; main method of pipe maintenance is by winching whose utmost length of operation is 120m. Likewise, highest intervals of manholes for other directly pipes are derived from their corresponding protection processes.


Related Discussions:- Spacing of manholes in straight sections

Sanitary, Design a sewer network

Design a sewer network

What is the meaning of untensioned reinforcement, Supplementary or Untensi...

Supplementary or Untensioned Reinforcement It is that reinforcement, provided in prestressed concrete member, which is not provided in a stretched condition like tendons.

What do by diaphragm wall, Q. What do by Diaphragm wall? For the constr...

Q. What do by Diaphragm wall? For the construction of diaphragm walls adjacent to buildings, former experience showed that excess slurry head above groundwater level had to be

Lifting hoops in precast concrete, Q. Lifting hoops in precast concrete - m...

Q. Lifting hoops in precast concrete - mild steel vs. high yield steel Strength of high yield steel is undoubtedly higher than mild steel and therefore high yield steel is gen

Survying, what aare the parts and function of steel tape ?

what aare the parts and function of steel tape ?

Guiding considerations in planning, Guiding Considerations in Planning: ...

Guiding Considerations in Planning: The following factors have a bearing on planning water transport facilities : (a)        Availability adequate land to accommodate the

Timber, Cross-section of exogeneous tree

Cross-section of exogeneous tree

Determine the late start time for activity, For the project network shown, ...

For the project network shown, the late start time (day) for activity "Q" is most nearly: Solution:  List the paths leading to "Q" and calculate the duration for each.

How do you measure concrete, We can measure concrete by Cubic feet, Cubic y...

We can measure concrete by Cubic feet, Cubic yards, Cubic Meter

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd