Spacing of manholes in straight sections, Civil Engineering

Assignment Help:

Question

Spacing of manholes in straight sections for diverse pipe sizes is stated in Storm water Drainage Manual. How are figures arrived on?

Answer

For pipe size is less than 300mm, rodding is typically adopted in which workers place about 1m long rods during pipes to location of blockage and physically operate the rod to clear blockage.

For pipe size is less than 700mm, water-jetting is generally working in which water is supplied from nearby fire hydrants and pressurized water jet is used for clearing obstacle.Winching scheme is adopted for every size of pipes.

For example, for pipe size more than 1050mm, it is stated in Storm water Drainage Manual that utmost intervals between manholes length of straight lengths should be 120m. This is as for sizes over 1050m; main method of pipe maintenance is by winching whose utmost length of operation is 120m. Likewise, highest intervals of manholes for other directly pipes are derived from their corresponding protection processes.


Related Discussions:- Spacing of manholes in straight sections

Surveying, difference between observed magnetic bearing and true magnetic b...

difference between observed magnetic bearing and true magnetic bearing

Reinforcement, Where we can provided overlap in columns

Where we can provided overlap in columns

Bond breaker for joint sealant, Joint sealant must be designed and construc...

Joint sealant must be designed and constructed to allow free extension and compression during the opening and closure of joints. In case joint sealants are attached to joint filler

Atomic weight of an atom is equal to, Atomic weight of an atom is equal to?...

Atomic weight of an atom is equal to? Answer: sum of the number of protons and neutrons.

Major bridge and important bridge, Major bridge - Major bridge is one of wh...

Major bridge - Major bridge is one of which has a total linear waterway of 18 m or more for multiple span and total linear water way of 12 m or more for single span. Important b

P.h.e, procedure for designing of sewage scheme

procedure for designing of sewage scheme

Water absorption test for precast concrete pipes, Question What is the ...

Question What is the major purpose of carrying out water absorption test for precast concrete pipes? Answer Cement will mix with additional water than is compulsory t

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd