Major bridge - Major bridge is one of which has a total linear waterway of 18 m or more for multiple span and total linear water way of 12 m or more for single span.
Important bridge - The bridges having total waterway of 1000 sq.m or total linear waterway of 300 m or more and the bridges classified as important by Chief Engineer / Chief Bridge Engineer, depending upon consideration such as depth of water way, extent of river training works and maintenance problems.
Q. What is Immediate Settlement? Strain in all coarse grained, dry or partly saturated fine grained soils occur immediately after the application of stress. Hence, this change
Define the term - Cracking Load and Proof Stress Cracking Load The load on the structural member at the time of the initiation of first visible crack in concrete is know
In a hydrometer analysis, 0.5 N of soil was mixed in water to form one litre of uniform suspen- sion. The corrected hydrometer reading after a lapse of 60 min. from the start of se
#how the result of DETERMINATION OF THE 10 PERCENT FINES value can be interprited?
Determine the meaning of Relaxation of Steel If the strain in steel is kept constant, it is seen that stresses in it reduce with time. It is called as relaxation of steel. Ten
HSC approved codes of pratice
if the diameter of the base remains constant by what factor should the altitude be multiplied to produce a cone with twice volume as the original
Explain Detention or Retention Ponds Detention/Retention Ponds: Designed to reduce and contain the peak runoff from developed areas (more impervious). Attempt to limit the runo
briefly explain the stacking of materials in the site for general building?
Q. Good surface regularity for sub-base in concrete pavement? Surfaces of sub-base material for concrete carriageway must be built in a regular manner due to the following reas
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd