Lubrication of rail joint, Civil Engineering

Assignment Help:

Lubrication of rail joints is one of the important items of permanent way works incidental to systematic track maintenance, the lubrication of joints is done for the following purpose -

i. To allow for free expansion of rails.

ii. To reduce wear and tear on the fishing planes of rails and fish plates.

The lubrication of rail joints also called oiling and greasing of fishplates is done once a year for all the joints during the moderate season which does not have extremes of weather (both hot & cold ). Rainy season is also excluded for this purpose. The lubricant used is a paste of workable consistency made of plumbago Kerosine oil and black oil in the following proportion -

Plumbago ( Dry Graphite ) = 5 kg.

Kerosine oil ( IInd Quality ) = 3.5 Liter.

Black or Reclaimed oil = 2.75 Liter.

For 100 joints of 52 kg / 90R or for 125 joints of 75 R / 60 R

Some items only plumbago and kerosin oil is used in the ratio of 3 : 2 for lubrication of fishplates the black oil is however used for oiling of fish bolts and nuts.


Related Discussions:- Lubrication of rail joint

Explain cercla and sara - hazardous waste regulations, Explain CERCLA and S...

Explain CERCLA and SARA - Hazardous Waste Regulations In 1980, the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) was enacted to address tho

Loss of camber in steel girders, Steel triangulated (open web) girders are ...

Steel triangulated (open web) girders are provided with camber to compensate for deflection under load. Out of the total design camber, the part corresponding to dead load is calle

Explain the term - non-bonded prestressed concrete, Explain the term - Non-...

Explain the term - Non-bonded Prestressed Concrete It is a method of construction in which the tendons are not bonded to the concrete. Ducts, housing the tendons, are not grout

Stress design method, You have been selected to assist the structural engin...

You have been selected to assist the structural engineer for a bridge replacement project.  Your task is to design the size of the footing for an interior bridge pier, based on the

TicketID: EM135335A06, I only want Part 1 of this order, can you adjust the...

I only want Part 1 of this order, can you adjust the quote?

Define the ignitability - hazardous waste, Define the Ignitability - Hazard...

Define the Ignitability - Hazardous Waste - is a liquid with flash point - Not a liquid and capable of spontaneous and sustained combustion under normal conditions - Ign

FOUNDATION, TYPE OF FOUNDATION IN LATERITE SOIL

TYPE OF FOUNDATION IN LATERITE SOIL

Investigation scour for underwater inspection of bridge, Define Investigati...

Define Investigation Scour for Underwater Inspection of Bridge? Investigation Scour is probably the most critical item to be aware of when performing an underwater inspection o

Steps to determine brake (bhp) and motor horsepower (mhp), Steps to determi...

Steps to determine the brake (bhp) and motor horsepower (mhp):  1) Determine water horsepower (whp). h A (Qgpm) (SG) / 3956 OR h A (Qcfs) (SG) / 8.814 2) Apply the pump

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd